Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

CM 4210 MIDTERM QUESTIONS AND CORRECT ANSWERS|GRADED A+ |VERIFIED ANSWERS|

Puntuación
-
Vendido
-
Páginas
37
Grado
A+
Subido en
26-05-2026
Escrito en
2025/2026

CM 4210 MIDTERM QUESTIONS AND CORRECT ANSWERS|GRADED A+ |VERIFIED ANSWERS|

Institución
CON 2370 Simplified Acquistion Procedures
Grado
CON 2370 Simplified Acquistion Procedures

Vista previa del contenido

CM 4210 MIDTERM QUESTIONS AND CORRECT ANSWERS|
GRADED A+ |VERIFIED ANSWERS|
Residential and building projects are usually designed by Correct
Answers an architect.


Heavy/Highway and industrial projects are usually designed by Correct
Answers an engineer


What type of construction projects usually involve contractor input
Correct Answers design-build (design-construct, construction
management, and design-manage, where team concept prevails. also
negotiated contracts sometimes)


What are the 5 means with which an owner uses in selecting a design
firm? Correct Answers 1. Negotiation with firm of choice
2. Design Competition
3. Submissions from interested designers, with selection based on
professional qualifications alone
4. Submissions that include designation of fees, which become a part of
the evaluation criteria
5. Bids for professional services and selection on the basis of price alone


What are the 5 basic services of the architect? Correct Answers 1.
Ascertaining the needs and desires of the owner
2. Developing the design
3. preparing the bid or negotiation documents

,4. Aiding in the selection of the contractor
5. Making an estimate of the construction costs


What are the 6 options for compensation structure of the A/E? Correct
Answers 1. Percentage of construction cost(most used)
2. Multiple of salary cost
3. Multiple of salary cost plus non-salary expense
4. fixed lump-sum
5. Total expense plus professional fee(a form of cost-plus)
6. Hourly per diem charge


In what phase of the construction project does the A/E act as on
independent contractor? Correct Answers Design


When can third-party liability of an A/E arise? Correct Answers If
bodily injury or property damage is caused by the negligence or failure
in the duty of the designer


When does liability for negligence lawsuits arise? Correct Answers At
substantial completion or acceptance of the work by the owner


Name the 6 areas where a contractor may provide input during design:
Correct Answers 1. Labor availability and costs
2. Material availability
3. Alternative methods and procedures

,4. Delivery times
5. Local work practices
6. General site planning


What three important functions do the drawings and specifications
serve? Correct Answers 1. The nature and extent of the construction to
be done
2. the materials to be provided
3. the quality of the workmanship


What is the purpose of an Advertisement for Bids? Correct Answers
Public notice to all contractors that those interested(and qualified) are
being sought to submit proposals for construction of a project


What is an invitation to bid? Correct Answers Notification to
preselected contractors to submit a proposal on a project


What is a project manual? Correct Answers Bid and contract documents
altogether in one book


What is the purpose of the instructions to bidders? Correct Answers To
make sure all bidders are bidding exactly under the same conditions


The Conditions of the Contract define and describe what? Correct
Answers The administrative and operational elements of the contract

, What are the 7 typical sections of the drawings? Correct Answers 1. Plot
plan, 2. foundation, 3. architectural, 4. structural, 5. electrical, 6.
mechanical, 7. and plumbing


What are open specifications? Correct Answers Descriptions of
characteristics and attributes of material and equipment to be
incorporated in the project in generic terms which establish quality
required in the material by the designer


What are closed specifications? Correct Answers When the quality
requirement established by the designer is established by listing a
specific brand-identified project.


What is a Base-Bid Specification? Correct Answers The contract
documents name products to be used in the base bid, but the contractors
can offer alternate items


What is an addendum? Correct Answers A modification to the bid
documents or to the contract documents issued by the designer during
the bidding period


What is a Owner-Designated Alternative? Correct Answers Alternate
materials or methods included within the original contract documents to
provide a means for the owner to consider different alternatives to the
original design to include or not as decided by the owner.

Escuela, estudio y materia

Institución
CON 2370 Simplified Acquistion Procedures
Grado
CON 2370 Simplified Acquistion Procedures

Información del documento

Subido en
26 de mayo de 2026
Número de páginas
37
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$17.99
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
cracker Chamberlain School Of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
2134
Miembro desde
3 año
Número de seguidores
1346
Documentos
50034
Última venta
1 día hace
✨ Cracker – Verified Study Powerhouse

Welcome to your shortcut to academic and certification success. I'm Cracker, a trusted top seller I specialize in high-quality study guides, test banks, certification prep, and real-world exam material all tailored to help you pass fast and score high.

3.8

390 reseñas

5
171
4
90
3
56
2
24
1
49

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes