●● Who is responisble for inspecting a trench before anyone goes in it
Answer: The equipment operator
●● What is the prefered sling angle
Answer: 60*
●● The top of the spoil pile is called
Answer: The crown
●● A four footbdeep trench requires an additional ladder for each _ of
open trench
Answer: 25ft
●● Materials mist be kept back from the edge of the trenxh a minimum
of
Answer: Two feet
●● When can inspector revoke a hoistinf licence
,Answer: Failure to pay excise tax
●● Who developed the ma crane hand signals
Answer: Ansi / asme
●● Dot stands for
Answer: Department of transportion
●● When do you do your walk around of the equpiment
Answer: Before you start it
●● In the one to one sloping ratio what does the 2nd one represent
Answer: Depth or verticle rise
●● On a track machine the gears should be where
Answer: In the rear
●● When load leveling when do you deploy your stablizers
Answer: Before you make the lift
●● When backfilling an excavation you should use a
Answer: Small lift , shade the ditch
, ●● In the state of MA what criteria require a hoisting license
Answer: More than 500lbs
Height greater than 10ft
Bucket bigger than 1/4 yard
●● What tyoe of saftey system isnused on de-energized circuts
Answer: Lockout tag out total de energization
●● In what time should you contact departmant of public safety if a
death occurs
Answer: Withen one hour
●● How many lbs in 1 ton
Answer: 2000
●● All welding and cutting on hoistinf equipment shall be done in
accoradance with the requirments of what
Answer: Aws Asme codes
●● What items should be checked on a daily basis
Answer: Fluid levels, hoses tires belts horn backup system brakes and
controls
QUESTIONS WITH VERIFIED ANSWERS
PACKAGE
●● Who is responisble for inspecting a trench before anyone goes in it
Answer: The equipment operator
●● What is the prefered sling angle
Answer: 60*
●● The top of the spoil pile is called
Answer: The crown
●● A four footbdeep trench requires an additional ladder for each _ of
open trench
Answer: 25ft
●● Materials mist be kept back from the edge of the trenxh a minimum
of
Answer: Two feet
●● When can inspector revoke a hoistinf licence
,Answer: Failure to pay excise tax
●● Who developed the ma crane hand signals
Answer: Ansi / asme
●● Dot stands for
Answer: Department of transportion
●● When do you do your walk around of the equpiment
Answer: Before you start it
●● In the one to one sloping ratio what does the 2nd one represent
Answer: Depth or verticle rise
●● On a track machine the gears should be where
Answer: In the rear
●● When load leveling when do you deploy your stablizers
Answer: Before you make the lift
●● When backfilling an excavation you should use a
Answer: Small lift , shade the ditch
, ●● In the state of MA what criteria require a hoisting license
Answer: More than 500lbs
Height greater than 10ft
Bucket bigger than 1/4 yard
●● What tyoe of saftey system isnused on de-energized circuts
Answer: Lockout tag out total de energization
●● In what time should you contact departmant of public safety if a
death occurs
Answer: Withen one hour
●● How many lbs in 1 ton
Answer: 2000
●● All welding and cutting on hoistinf equipment shall be done in
accoradance with the requirments of what
Answer: Aws Asme codes
●● What items should be checked on a daily basis
Answer: Fluid levels, hoses tires belts horn backup system brakes and
controls