Concrete Batch Plant Operator Exam (FDOT) Exam Questions and Answers (Verified Answers) Updated (Actual Exam) LATEST VERSION!!

Document preview thumbnail
Vista previa 2 fuera de 5 páginas

Concrete Batch Plant Operator Exam (FDOT) Exam Questions and Answers (Verified Answers) Updated (Actual Exam) LATEST VERSION!!

Vista previa del contenido

Concrete Batch Plant Operator Exam (FDOT) Exam Questions and Answers
(Verified Answers) Updated (Actual Exam) LATEST VERSION!!




Stockpiles of aggregate shall be maintained in a well-drained condition in order to: - (answer)Minimize
Free Water Content



Coarse aggregate stockpiles must be sprinkled for at lest how many hours prior to batch for FDOT? -
(answer)24



Free moisture of the aggregate means: - (answer)Moister on the surface of an aggregate that is above
and beyond the absorbed moister in the aggregate.



If the moister test is done other than by the cook-out method, how often shall the other methods be
verified? - (answer)Each week



For drill shaft concrete, the quantity of cement replaced with fly ash shall be: - (answer)33 thru 37%



In concrete, which material has a specific gravity of one? - (answer)Water



What is the air content range for all classes of structural concrete except Class IV Shaft? - (answer)1.00
thru 6.00%



When can unmetered water be added to the concrete? - (answer)Not at all.



Do not allow the total number of revolution at mixing speed to exceed: - (answer)160 Revolutions



After all materials have been charged into the transit mixer drum, the concrete must be mixed at how
many revolutions at the plant before leaving for the project? - (answer)70 to 100



When the water meters / scales are calibrated, prior to production, at what frequency should they be
checked there after? - (answer)3 moths

, Concrete Batch Plant Operator Exam (FDOT) Exam Questions and Answers
(Verified Answers) Updated (Actual Exam) LATEST VERSION!!




To what accuracy should the scales for weighing cement , pozzolan, slag and aggregates at the plant be
maintained - (answer)0.5% of maximum load normally handled



For concrete containing a water-reducing retarding admixture, in an agitator truck, the maximum time
for depositing the concrete shall not exceed: - (answer)90 minutes



If a load of concrete has been rejected due to excessive slump, the concrete may remain in the
transporting vehicle to reduce the slump. - (answer)Is not allowed.



Who places the orders for concrete with the producer? - (answer)The contractor



The minimum normal sampling frequency for the chloride content of structural concrete is: - (answer)1
per design mix in use from the first day of production and every 30 calendar days or less thereafter.



In what moister condition are the aggregates on the approved concrete mix designs? - (answer)SSD
condition



The specific gravity of an aggregate is the ratio of its unit weight to the weight of an equal absolute
volume of: - (answer)Water



What is the weight of a bag of Portland cement in the USA? - (answer)94 lbs



What is the maximum concrete temperature allowed when using a hot weather design mix? -
(answer)100 degrees F



Who is responsible for signing the FDOT delivery ticket at the concrete plant? - (answer)The FDOT
qualified batch plant operator

Información del documento

Subido en
23 de mayo de 2026
Número de páginas
5
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$15.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Hdocvision
4.9
(282)
Vendido
1285
Seguidores
10
Artículos
1209
Última venta
1 semana hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes