Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 4 fuera de 98 páginas
Examen

NERC PREP - RELIABILITY EXAM QUESTIONS WITH CORRECT VERIFIED ANSWERS UPDATED.

Document preview thumbnail
Vista previa 4 fuera de 98 páginas

NERC PREP - RELIABILITY EXAM QUESTIONS WITH CORRECT VERIFIED ANSWERS UPDATED.

Vista previa del contenido

SOS NERC




NERC PREP - RELIABILITY EXAM QUESTIONS
WITH CORRECT VERIFIED ANSWERS UPDATED


If a high voltage current (HVDC) ties is on the Scheduling Path
for a transaction, the ____________ shall coordinate the
Interchange Schedule with the Transmission Operator of the
HVDC tie.


A) Transmission Service Provider at the sending and receiving
ends of the tie.


B) Source and Sink Balancing Authorities


C)Sending and Receiving Balancing Authorities


D)Transmission Operators at the sending and receiving ends of
the HVDC tie. -Answer-C) Sending and Receiving Balancing
Authorities


Balancing Authorities on the Scheduling Path shall be
responsible for assessing and approving or denying the
Interchange Transaction based on which of the following:


1.Transaction Magnitude
2.Scheduling path
3.OASIS reservation
4.Ramp rate




SOS NERC PREP - RELIABILITY EXAM QUESTIONS WITH CORRECT VERIFIED ANSWERS UPDATED

,SOS NERC




A) 1, 3 and 4
B) 1, 2 and 3
C) 2, 3 and 4
D)1, 2 and 4 -Answer-D) 1, 2 and 4


Who must approve a Reliability Adjustment Arranged
Interchange before it becomes Confirmed Interchange?


A)Only the Source and Sink Balancing Authorities associated
with the Interchange


B)The Reliability Coordinator approves all Reliability Adjustment
Arranged Interchange


C)All Balancing Authorities involved in the Interchange
D) Each Balancing Authority and Transmission Service
Provider associated with the Interchange -Answer-A) Only the
Source and Sink Balancing Authorities associated with the
Interchange


A Reliability Adjustment Arranged Interchange has been
submitted and the Source Balancing Authority for the
Interchange must deny it due to a reliability issue. What action
must the Balancing Authority take?


A) A Source BA cannot deny a Reliability Adjustment Arranged
Interchange




SOS NERC PREP - RELIABILITY EXAM QUESTIONS WITH CORRECT VERIFIED ANSWERS UPDATED

,SOS NERC




B) Inform the Transmission Service Providers of the Denial.


C)Submit a Request for Denial within 10 minutes


D)Notify the BA's Reliability Coordinator of the denial within 10
minutes Answer-D) Notify the BA's Reliability Coordinator of
the denial within 10 minutes


The Source Balancing Authority must assess the following items
of Arranged Interchange before approving:


A) Scheduling path connectivity
B) Megawatt profile including Ramp start and stop times
C) Interchange duration
D)All the answers are correct -Answer-D) All the answers are
correct


The total capacity of a facility in a transmission path is 1600 MW.
The Available Transfer Capability of the same path from A to B is
1200 MW. An unscheduled (parallel) flow of 600 MW is also
present from A to B. What is the maximum net interchange that
can be scheduled from A to B?


A) 1600 MW
B) 600 MW
C) 1200 MW
D)1000 MW -Answer-C) 1200 MW




SOS NERC PREP - RELIABILITY EXAM QUESTIONS WITH CORRECT VERIFIED ANSWERS UPDATED

, SOS NERC




Balancing Authority A (BA A) has two tie-lines with BA B with
MW readings of +100 MW and -50 MW respectively. BA C has
two tie-lines with BA B with actual MW readings of +60 MW and
+90 MW respectively. If these are the only tie-lines for BA B,
what is the net actual interchange for BA B?


A) -150
B) -200
C) 200
D)150 -Answer-B) -200


When a Dynamic Schedule varies enough to require updating the
tag, whose responsibility is it to ensure the update is
accomplished?


A) Sink Balancing Authority


B) The Purchasing-Selling Entity responsible for tagging the
schedule


C)Transmission Service Provider


D)Source Balancing Authority -Answer-B) The Purchasing-
Selling Entity responsible for tagging the schedule


The Transmission Operator and Balancing Authority shall
develop, maintain, and implement one or more Reliability
Coordinator-reviewed Operating Plan. What is the purpose of
Operating Plans?


SOS NERC PREP - RELIABILITY EXAM QUESTIONS WITH CORRECT VERIFIED ANSWERS UPDATED

Información del documento

Subido en
22 de mayo de 2026
Número de páginas
98
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$21.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Examdoctor1
3.7
(6)
Vendido
33
Seguidores
12
Artículos
2986
Última venta
2 meses hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes