BUILDING
CONTRACTOR
PRACTICE EXAM
QUESTIONS AND
ANSWERS 2026 - 2027
1. A building permit is primarily required to:
A. Increase project cost
B. Ensure compliance with building codes
C. Eliminate inspections
D. Reduce labor requirements
Correct Answer: B
Rationale: Permits ensure construction complies with applicable codes
and regulations.
2. The Virginia Uniform Statewide Building Code is based largely on:
A. International Codes
END OF
PAGE
1
, VIRGINIA RESIDENTIAL LATEST
BUILDING
CONTRACTOR
PRACTICE EXAM
QUESTIONS AND
ANSWERS 2026 - 2027
B. Local newspaper standards
C. Federal tax law
D. Real estate contracts
Correct Answer: A
Rationale: Virginia adopts and modifies International Code standards.
3. A contractor license is required to:
A. Purchase tools only
B. Legally perform regulated contracting work
C. Apply for utility service only
D. Sell appliances only
END OF
PAGE
2
, VIRGINIA RESIDENTIAL LATEST
BUILDING
CONTRACTOR
PRACTICE EXAM
QUESTIONS AND
ANSWERS 2026 - 2027
Correct Answer: B
Rationale: Licensing protects consumers and ensures contractor
competency.
4. A footing transfers building loads to:
A. Roof framing
B. The soil or foundation base
C. Interior walls only
D. Ceiling joists
Correct Answer: B
Rationale: Footings distribute structural loads safely to the ground.
END OF
PAGE
3
, VIRGINIA RESIDENTIAL LATEST
BUILDING
CONTRACTOR
PRACTICE EXAM
QUESTIONS AND
ANSWERS 2026 - 2027
5. Concrete gains most of its design strength in approximately:
A. 1 day
B. 7 days
C. 28 days
D. 90 days
Correct Answer: C
Rationale: Standard concrete compressive strength is based on 28-day
curing.
6. Rebar in concrete is primarily used to:
A. Reduce curing time
END OF
PAGE
4