Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

ConstruCtion ManageMent Final exaM study guide Questions and CorreCt ansWers (veriFied) | latest uPdate 2026/2027 | graded a+ | Brand neW | 100% guaranteed Pass

Puntuación
-
Vendido
-
Páginas
12
Grado
A+
Subido en
20-05-2026
Escrito en
2025/2026

ConstruCtion ManageMent Final exaM study guide Questions and CorreCt ansWers (veriFied) | latest uPdate 2026/2027 | graded a+ | Brand neW | 100% guaranteed Pass

Institución
ConstruCtion ManageMent
Grado
ConstruCtion ManageMent

Vista previa del contenido

ConstruCtion ManageMent Final exaM study guide
Questions and CorreCt ansWers (veriFied) | latest
uPdate 2026/2027 | graded a+ | Brand neW | 100%
guaranteed Pass



The following are the challenges facing the construction industry today, except -
ANSWER-decreasing demand in sustainability requirements


the parameters define the overall extent of work to be included in a construction
contract. - ANSWER-scope of project


a supplemental drawing to the plans and specifications that details fabrication method,
materials, and models of a product or installation associated with the project. -
ANSWER-shop drawings


it is a process of awarding a contract to subcontractors and issuing a purchase order
for materials and equipment. - ANSWER-buy out


a request made by the owner to add or subtract features to the scope of the project
resulting in changes to the contract - ANSWER-change order


a daily amount of money paid by the contractor to the owner for each day that the
project fails to meet the completion date specified in the contract - ANSWER-liquidated
damage


a change or addition to the contract documents issued after the documents have been
released but before the bids are due - ANSWER-addenda


a contract document set consists of - ANSWER-an agreement, construction drawings,
specifications, addenda, general and supplementary condition

, the shop drawings are prepared by the - ANSWER-architect


in the traditional project delivery method for buildings, the day-to-day supervision of the
construction is generally the responsibility of the - ANSWER-general contractor


what is the first known recorded building code that outlines the roles and duties of the
master builder - ANSWER-code of hammurabi


in the construction management (CM) method of project delivery, there is normally no
general contractor - ANSWER-true


in the construction management at risk (CMAR) method of project delivery, the
construction manager - ANSWER-manages the project's construction during the
construction phase


what project delivery method in which only one firm is contracted for both design and
construction of the project - ANSWER-design-build


what delivery method is best used if highly technical in nature of the project that
requires good communication and coordination need to occur between designers and
builder? - ANSWER-Design-build


what delivery method in which there is no or limited input from contractors and
subcontractors during the design phase? - ANSWER-Design-Bid-Build


Turnkey method is a variation of what delivery method when it also involves arranging
for land and financing of the project? - ANSWER-Design-Build


what delivery method in which it is hard to get real up-front fixed price, or price may not
be known until it is actually built? - ANSWER-design-build


what delivery method in which the owner assumes full responsibility on all liability risk
during construction stage? - ANSWER-CM

Escuela, estudio y materia

Institución
ConstruCtion ManageMent
Grado
ConstruCtion ManageMent

Información del documento

Subido en
20 de mayo de 2026
Número de páginas
12
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$17.99
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
DoctorDee Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
32
Miembro desde
2 año
Número de seguidores
7
Documentos
5120
Última venta
1 semana hace
Hi wayne1111

3.5

6 reseñas

5
3
4
0
3
1
2
1
1
1

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes