estimating - ANSWER-The process of determining the anticipated cost of materials, labor, and equipment of a proposed project. take-off - ANSWER-The process in which detailed lists are compiled, based on drawings and specifications, of all the material and equipment necessary to construct a project. The cost estimator uses this list to calculate how much it will cost to build the project. quantities - ANSWER-Measured amounts of construction items expressed in their customary units. quantification - ANSWER-In estimating an activity to translate project scope information into resource quantities suitable for costing. In the engineering and construction industry, a takeoff is a specific type of quantification that is a measurement and listing of quantities of materials from drawings.

Mostrar más Leer menos
Institución
COSC 275 WOD 1-4
Grado
COSC 275 WOD 1-4

Vista previa del contenido

COSC 275 WOD 1-4 EXAM WITH
CORRECT SOLUTIONS
estimating - ANSWER-The process of determining the anticipated cost of materials,
labor, and equipment of a proposed project.

take-off - ANSWER-The process in which detailed lists are compiled, based on
drawings and specifications, of all the material and equipment necessary to construct
a project. The cost estimator uses this list to calculate how much it will cost to build
the project.

quantities - ANSWER-Measured amounts of construction items expressed in their
customary units.

quantification - ANSWER-In estimating an activity to translate project scope
information into resource quantities suitable for costing. In the engineering and
construction industry, a takeoff is a specific type of quantification that is a
measurement and listing of quantities of materials from drawings.

quantity survey - ANSWER-A detailed analysis of material and equipment required to
construct a project.

area - ANSWER-A measurement of a given planar region or of the surface of a solid.

area method - ANSWER-A construction cost estimating system employing unit
square foot costs multiplied by the adjusted gross floor area of a building.

length - ANSWER-The longest dimension of an object.

linear measurement - ANSWER-A unit or system of units for measuring length: 12" =
1', 3' = 1 yard, 1 yard = 0.9144 meters, 1 mile = 5,280 feet

dimension - ANSWER-A distance between two points, lines, or planes

specifications or specs - ANSWER-Documents that define the qualitative
requirements for products, materials, and workmanship upon which the contract for
construction is based.

drawings - ANSWER-Graphic illustrations depicting the dimensions, design, and
location of a project. Generally including plans, elevations, details, diagrams,
schedules, and sections

addendum - ANSWER-A document describing an addition, change, correction, or
modification to contract documents. An addendum is issued by the design
professional during the bidding period or prior to the award of contract, and is the
primary method of informing bidders of modifications to the work during the bidding
process. Addenda become part of the contract documents.

Escuela, estudio y materia

Institución
COSC 275 WOD 1-4
Grado
COSC 275 WOD 1-4

Información del documento

Subido en
19 de mayo de 2026
Número de páginas
3
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$11.99
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
NursingTutor1 West Virginia University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1697
Miembro desde
3 año
Número de seguidores
1073
Documentos
18441
Última venta
3 días hace
Nursing Tutor

Paper Due? Worry not. Hello. Welcome to NursingTutor. Here you\'ll find verified study materials for your assignments, exams and general school work. All papers here are graded A to help you get the best grade. Also, I am a friendly person so, do not hesitate to send a message in case you have a query. I wish you Luck.

3.9

459 reseñas

5
217
4
79
3
92
2
21
1
50

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes