Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

COSC 275 WORDS OF THE DAY QUESTIONS AND ANSWERS 100% CORRECT

Puntuación
-
Vendido
-
Páginas
3
Grado
A
Subido en
19-05-2026
Escrito en
2025/2026

estimating - ANSWER-the process of determining the anticipated cost of materials, labor, and equipment of a proposed project take-off - ANSWER-the process in which detailed lists are compiled, based on drawings and specifications, of all the materials and equipment necessary to construct a project. The cost estimator uses this list to calculate how much it will cost to build the project. quantities - ANSWER-measured amounts of construction items expressed in their customary units quantification - ANSWER-in estimating, an activity to translate project scope information into resource quantities suitable for costing. In engineering and construction industry, a takeoff is a specific type of quantification that is a measurement and listing of quantities of materials and drawings

Mostrar más Leer menos
Institución
COSC 275
Grado
COSC 275

Vista previa del contenido

COSC 275 WORDS OF THE DAY
QUESTIONS AND ANSWERS 100%
CORRECT
estimating - ANSWER-the process of determining the anticipated cost of materials,
labor, and equipment of a proposed project

take-off - ANSWER-the process in which detailed lists are compiled, based on
drawings and specifications, of all the materials and equipment necessary to
construct a project. The cost estimator uses this list to calculate how much it will cost
to build the project.

quantities - ANSWER-measured amounts of construction items expressed in their
customary units

quantification - ANSWER-in estimating, an activity to translate project scope
information into resource quantities suitable for costing. In engineering and
construction industry, a takeoff is a specific type of quantification that is a
measurement and listing of quantities of materials and drawings

quantity survey - ANSWER-a detailed analysis of material and equipment required to
construct a project

area - ANSWER-a measurement of a given planar region or of the surface of a solid

area method - ANSWER-a construction cost estimating system employing unit
square foot costs multiplied by the adjusted gross floor area of a building

length - ANSWER-the longest dimension of an object

linear measurement - ANSWER-a unit or system of units for measuring length

dimension - ANSWER-a distance between two points, lines, or planes

specifications or specs - ANSWER-documents that define that qualitative
requirements for products, materials, and workmanship upon which the contract for
construction is based

drawings - ANSWER-portion of the contract documents that gives a graphic
representation of the work to be done in the construction of a project

foundation - ANSWER-the entire substructure below the first floor or frame of a
building, including the footing upon which the building rests

Escuela, estudio y materia

Institución
COSC 275
Grado
COSC 275

Información del documento

Subido en
19 de mayo de 2026
Número de páginas
3
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$13.49
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
NursingTutor1 West Virginia University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1697
Miembro desde
3 año
Número de seguidores
1073
Documentos
18441
Última venta
3 días hace
Nursing Tutor

Paper Due? Worry not. Hello. Welcome to NursingTutor. Here you\'ll find verified study materials for your assignments, exams and general school work. All papers here are graded A to help you get the best grade. Also, I am a friendly person so, do not hesitate to send a message in case you have a query. I wish you Luck.

3.9

459 reseñas

5
217
4
79
3
92
2
21
1
50

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes