Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 3 fuera de 18 páginas
Examen

VDOT Soils and Aggregate Compaction Exam Questions and Answers| Updated

Document preview thumbnail
Vista previa 3 fuera de 18 páginas

VDOT Soils and Aggregate Compaction Exam Questions and Answers| Updated

Vista previa del contenido

VDOT Soils and Aggregate Compaction Exam
Questions and Answers| Updated

T or F - The voids in a saturated soil are partly filled with water and partly filled
with air.
False - They are completely filled with water




What classification system does VDOT use to classify soils?
AASHTO and Unified Soil Classification System




___ refers to the texture and firmness of a soil
Consistency




Silt and clay are made up of particles that are smaller than the ___ sieve.
No. 200 (75um)




What is the distribution of various particles sizes within the material?
Gradation

,___ means that the particles in a mixture are sized so that they fill most of the
voids; there is very little space in between soil or stone particles
Dense graded




What is the moisture content at which a soil begins to behave like a liquid called?
Liquid Limit




What is the behavior of a material where the material deforms under load and
does not go back to it's original shape called?
Plasticity




What is the moisture content at which a soil can be compacted to its maximum
dry density with the least amount of compactive effort called?
Optimum Moisture Content




T or F - A soil that contains a high percentage of fines is more affected by water
than one with a low percentage of fines
True

, T or F - Open graded aggregates are used in a pavement to give the structure
more strength
False - Dense graded aggregates are used in a pavement to give the structure
more strength




T or F - Clearing and Grubbing is required in fill sections less than 5 feet in depth,
in borrow areas before excavation can begin, and in all cut sections.
True




In fill sections where stumps may be left in place, they must be no more than
___ high
6 inches




___ means to crown surface of embankment, roll surface of embankment
smooth, direct water to appropriate erosion and siltation controls
Grading to Drain




What is the first lift of embankment material placed in swampy areas called?
Work Platform

Información del documento

Subido en
17 de mayo de 2026
Número de páginas
18
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$9.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
KelvinBrooks
4.3
(86)
Vendido
779
Seguidores
11
Artículos
5601
Última venta
3 horas hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes