Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 3 fuera de 28 páginas
Examen

WGU_C215_WGU_C215_OPERATIONS_MANAGEMENT_OBJECTIVE ASSESSMENT

Document preview thumbnail
Vista previa 3 fuera de 28 páginas

WGU_C215_WGU_C215_OPERATIONS_MANAGEMENT_OBJECTIVE ASSESSMENT

Vista previa del contenido

WGU C215 WGU C215 OPERATIONS MANAGEMENT
OBJECTIVE ASSESSMENT LATEST EXAM
LATEST UPDATED VERSION 2




What tool should the manufacturing company use to determine
where the new distribution center should be located?

-By using the break-even analysis
-By using the load-distance model
-by using the center-of-gravity approach
-By using the transportation method -ANSWER->by using the
load-distance model

Which two types of operations include repetitive processes? -
Continuous process
-Batch process
-Line process
-Project process -ANSWER->continuous process line
process

,A comprehensive automobile collision shop offers body and
engine repair as well as custom vehicle paint options.

Which two operational processes would suit this shop?

-Continuous Process
-Batch process
-Project proces
-Line process -ANSWER->batch process
project process

What is a bottleneck in a flowchart?

-multiple storage areas
-The longest task in the process
-two stages operation independently
-The point where production is evened out -ANSWER->The
longest task in the process

Which formula would compute process velocity?

-Time a resources is used/time a resource is available

, -

Throughput time/value-added time
-Output/input
-Actual output/standard output -ANSWER->throughput
time/value-added time

Which formula would indicate that a fast-food restaurant was
performing at, above, or below its benchmark?

-Time a resources is used/time a resource is available
-Throughput time/value-added time
-Output/input
-Actual output/standard output -ANSWER->actual
output/standard output

In which organizational layout would one expect to see items
arranged by type?

-Fixed
-Process
-Hybrid
-Product -ANSWER->process

A construction company produces pre-fabricated homes. The
manager has discovered the following challenges within one of
the facilities:




-

Información del documento

Subido en
15 de mayo de 2026
Número de páginas
28
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$12.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
LeeErickson
1.5
(2)
Vendido
12
Seguidores
1
Artículos
3425
Última venta
2 semanas hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes