Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 4 fuera de 420 páginas
Examen

3B2 - Ultimate ABSA Study Guide C1-15 | Comprehensive Q & A For Certification Success

Document preview thumbnail
Vista previa 4 fuera de 420 páginas

3B2 - Ultimate ABSA Study Guide C1-15 | Comprehensive Q & A For Certification Success

Vista previa del contenido

1|Page


3B2 - Ultimate ABSA Study Guide C1-15 |
Comprehensive Q & A For Certification
Success

A speed sensitive governor may be:
1. Proportional.
2. Mechanical.
3. Mechanical-hydraulic.
4. Electronic-hydraulic.
a. 1,2
b. 3,4
c. 1,2,3
d. 2,3,4
e. 1,2,3,4. -correct-answer-D




In a mechanical-hydraulic governor system, what is the purpose of the auxiliary oil
pump?
a. It provides oil pressure in case of a main pump failure.
b. It provides oil pressure to the bearings.
c. It provides oil pressure to the governor system.
d. It provides oil pressure during start-up of the turbine.
e. It boosts the main pump's pressure. -correct-answer-D

,2|Page




An electronic-hydraulic governor system uses:
a. High pressure oil from the turbine oil system.
b. A separate fluid power unit for high pressure oil.
c. Oil pressure of approximately 3000-4000 kPa.
d. Pressure oil from the turbine oil system and boosts it to
approximately 8200-11000 kPa.
e. Flyweights similar to a mechanical-hydraulic governor. -correct-answer-B




A mechanical overspeed trip is designed to in the event of an overspeed
condition.
a. Prevent the turbine's speed from exceeding 150% of its rated speed.
b. Activate an alarm.
c. Drop the turbine's load.
d. Shut off the turbine's steam supply.
e. Throttle the inlet steam. -correct-answer-D




When starting a large condensing or extraction turbine, the lubricating oil pump is
usually started:
a. Just before the turbine is rotated.
b. One half hour before the turbine is rotated.

,3|Page


c. 2-3 hours before the turbine is rotated.
d. 6-8 hours before the turbine is rotated.
e. The pump is left running at all times. -correct-answer-C




The extraction (condensate) pump is put into operation the .
1. Before.
2. After .
3. Air ejector.
4. Jack oil pump.
5. Condenser circulating water pump.
a. 1, 3
b. 2, 3
c. 1, 4
d. 1, 5
e. 2, 5. -correct-answer-A




When starting a turbine, a speed of 200-300 rpm is maintained for what purpose?
a. To allow the barring gear time to disengage.
b. To allow the operator time to listen for rubbing or other
unusual noises.
c. To ensure all controls are functioning.

, 4|Page


d. To warm up the rotor and casing.
e. To ensure the lube oil system is operating correctly. -correct-answer-D




The warm-up time required of a turbine is dependant on:
a. How quickly the turbine is required.
b. The manufacturer's instructions.
c. The size of the turbine.
d. The type of turbine.
e. Whether the steam is dry or wet. -correct-answer-C




When shutting down a turbine, the first thing done is:
a. Turn off the lube oil cooling water.
b. Test the emergency trip.
c. Start the auxiliary oil pump.
d. Shut off the steam supply.
e. Reduce the load to zero. -correct-answer-E




Sealing steam to the turbine glands is admitted is put in operation
a. Before the extraction pump.
b. Before the condenser circulating water pump.

Información del documento

Subido en
14 de mayo de 2026
Número de páginas
420
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$19.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
EliteStudyHub
2.1
(10)
Vendido
85
Seguidores
6
Artículos
9373
Última venta
1 día hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes