CERTIFICATION EXAM QUESTIONS AND CORRECT
ANSWERS (VERIFIED ANSWERS) Q&A
2026|INSTANT DOWNLOAD PDF
1. Which is the primary goal of disaster recovery planning?
A. Increase organizational profits
B. Restore IT and business operations after disruption
C. Eliminate all risks permanently
D. Replace business leadership
Rationale: Disaster recovery focuses on restoring critical
systems and operations after a disruption, not eliminating all
risks or changing leadership.
Correct Answer: B
2. What does RTO stand for in disaster recovery?
A. Recovery Time Objective
B. Risk Transfer Option
C. Recovery Task Output
D. Response Time Operation
Rationale: RTO defines the maximum acceptable downtime for
systems after a disruption.
Correct Answer: A
,3. What is RPO in disaster recovery planning?
A. Recovery Process Output
B. Risk Probability Outcome
C. Recovery Point Objective
D. Response Planning Order
Rationale: RPO defines the maximum acceptable data loss
measured in time.
Correct Answer: C
4. Which document identifies critical business functions and
dependencies?
A. Incident Log
B. Business Impact Analysis (BIA)
C. Audit Report
D. Risk Register
Rationale: BIA evaluates essential operations and their impact if
disrupted.
Correct Answer: B
5. What is the first step in disaster recovery planning?
A. System restoration
B. Risk assessment and BIA
,C. Staff training
D. Infrastructure purchase
Rationale: Planning begins with identifying risks and business
impacts.
Correct Answer: B
6. Which is a natural disaster risk?
A. Cyberattack
B. Earthquake
C. Data breach
D. Insider threat
Rationale: Earthquakes are natural hazards, unlike human-
caused risks.
Correct Answer: B
7. What is a cold site?
A. Fully equipped backup facility ready for immediate use
B. Facility with no equipment but available space
C. Cloud-based recovery system
D. Active production site
Rationale: A cold site provides space but requires setup after
activation.
Correct Answer: B
, 8. Which recovery site is most expensive but fastest to
activate?
A. Cold site
B. Warm site
C. Hot site
D. Mobile site
Rationale: Hot sites are fully operational and mirror production
systems.
Correct Answer: C
9. What does a disaster recovery plan primarily include?
A. Marketing strategies
B. IT system recovery procedures
C. Employee salary structure
D. Product design
Rationale: It focuses on restoring IT systems and operations.
Correct Answer: B
10. Which team is responsible for executing recovery
procedures?
A. Sales team
B. Disaster recovery team
C. Marketing team
D. Legal team