Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 3 fuera de 18 páginas
Examen

DBIA TEST 2025 WITH 250 EXAM REVIEW QUESTIONS AND CORRECT VERIFIED ANSWERS DBIA EXAM DESIGN BUILD QS AS 2025 (BRAND NEW)

Document preview thumbnail
Vista previa 3 fuera de 18 páginas

DBIA TEST 2025 WITH 250 EXAM REVIEW QUESTIONS AND CORRECT VERIFIED ANSWERS DBIA EXAM DESIGN BUILD QS AS 2025 (BRAND NEW).

Vista previa del contenido

.
.
k
.


DBIA TEST 2025 WITH 250 EXAM REVIEW QUESTIONS
AND CORRECT
VERIFIED ANSWERS/ DBIA EXAM – DESIGN BUILD QS &
AS 2025 (BRAND NEW)


How team members are organized, establishes when parties
engage, determines roles of parties, and determines sequence
of design, procurement, and construction (db, cmar, dbb) -
ANSWER-Project Delivery System


designer of record confirms the documents comply with the
owner's project criteria, all codes and standards; design
confirmed within budget and schedule; owner's review for
compliance has been completed; changes made after this may
result in request for equitable adjustment; the owner and DB-er
should reach a consensus on this definition and when it occurs
during the post-award process - ANSWER-design commitment


identify design tasks and decisions to complete the design of
the project; decision making - how and when to make decisions;
identify work flow of design deliverables best supporting
construction; optimize time for design phase co-location;
optimize opportunities for constructability reviews; the initial
prelim should be considered in the proposal - ANSWER-
integrated design work plan (IDWP)


four phases of oversight - ANSWER-pre-construction, contract,
close-out, and performance evaluation


phase which involves distribution of contract documents,
confirm subcontractor flow-down clauses, confirm incremental





,.
.
k
.

design packages, confirm what constitutes design commitment,
obtain performance/payment bonds, obtain certificates of
insurance, confirm attainment of permits and access rights,
issue notice to proceed, and schedule initial formal partnering
workshop - ANSWER-pre-construction


If a change order becomes necessary in a design-build
scenario, you can use this to make sure you're payed for the
additional work - ANSWER-Request for Equitable Adjustment
(REA)


formal partnering typically results in mutually developing one of
3 things - ANSWER-charter, communications matrix, or issue
resolution ladder


commitment between two or more organizations for the
purpose of achieving
specific business objectives by maximizing the effectiveness of
each participant's resources - ANSWER-formal partnering


cost plus fee, lump sum/firm fixed price, and target price are
this type of incentive - ANSWER-implicit


incentive contracts (shared savings--early completion) and
award fees (noncost performance factors) are this type of
incentive. it is best practice for owners to include this type of
incentive in their design-build contracts - ANSWER-explicit


an objective measure for evaluating a project that is easy to
measure - ANSWER-design quality






,.
.
k
.

a subjective measure for evaluating a project that is hard to
measure; this is determined through the design process, not
after the project is completed - ANSWER-design value


(performance + quality) / cost - ANSWER-best value


(what you get) / (what you give) - ANSWER-value


A process that lists the advantages of options and helps quickly
identify the options with the most advantages. This process
avoids the double counting
inherent in listing pros and cons when in one option is also the
con in another. - ANSWER-Choosing by advantages (CBA)


amount of $$ added to the estimate to cover risks associated
with the unknown - ANSWER-contingency


tool used to identify, evaluate, manage, and resolve changes
during design, procurement, and construction; encourages
proactive approach with the owner to resolve any changes as
design evolves; mitigates disputes before they become bigger
problems - ANSWER-trend management program


design development changes, work quantity adjustments,
changes with constructability or fabrication issues, escalation
with materials, labor, or equipment costs, labor and/or
equipment productivity adjustments, transportation and
storage cost adjustments, and items that may have been
included in the scope but left out of the proposal - ANSWER-
internal trends





Información del documento

Subido en
13 de mayo de 2026
Número de páginas
18
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$21.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Examdoctor1
3.7
(6)
Vendido
33
Seguidores
12
Artículos
2986
Última venta
2 meses hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes