Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 4 fuera de 91 páginas
Examen

New York Crane Operator Licensing EXAM STUDY GUIDE 2026/2027 ACCURATE QUESTIONS WITH CORRECT DETAILED SOLUTIONS || 100% GUARANTEED PASS NEWEST VERSION

Document preview thumbnail
Vista previa 4 fuera de 91 páginas

New York Crane Operator Licensing EXAM STUDY GUIDE 2026/2027 ACCURATE QUESTIONS WITH CORRECT DETAILED SOLUTIONS || 100% GUARANTEED PASS NEWEST VERSION 1. What is a ant-two blocking device, and where is it located? - ANSWER it stops the hook from accidentally colliding with the boom tip. its a cylinder located near top 2. Principle of leverage - ANSWER it is the weight diagram. 3. dynamic loading - ANSWER erratic or sudden movement of loads must be avoided. always operate the crane in a smooth and controlled manner 4. parts of line - ANSWER the number of hoist ropes which appear to directly support the lower load block or overhaul ball. 5. each hoist lowers the pulling force needed 6. high winds - ANSWER when wind exceeds 30mph, it is advised to consider stopping the operation. However, load size, shape and weight could require that the operation be stopped when wind speed is much less than 30mph 7. kinking - ANSWER when the rope turns gets a "kink" in it 8. what are 3 operational aids? - ANSWER 1. load weight or load moment indicator 2. boom angle indicator 3. Anti two blocking device 9. the test answer is probably "load block" 10. OSHA requires that before being used, cranes which have been idle for 3+ months must.... - ANSWER be given a monthly inspection by a qualified person 11. How must the crane be set up? talking about the tires - ANSWER all tires must be relieved of the cranes weight 12. use of blocking - ANSWER ensure blockinbg is level and that the outrigger pad is at 90 degrees to the stabilizer 13. required clearance for operations near high voltage power lines. Up to 50 kV - ANSWER 10 feet 14. what do you do if your crane comes into contact with a power line - ANSWER stay in the cab 15. What is the correct response to contact with a power line - ANSWER try to disengage the crane from contact 16. Should you climb or jump off a crane, after it comes into contact with a power line? - ANSWER JUMP. do not make contact with the crane and the ground at the same time 17. how to climb on and off the crane - ANSWER always face the machine when climbing on and off and maintain "three-point contact" at all times 18. What is the following ASME standards applies directly to mobile cranes? - ANSWER ASME Standard B30.5 19. The primary concern of every mobile crane operator must be.. - ANSWER Safety 20. Per OSHA standards, a mobile crane operator certification is valid for - ANSWER 5 years 21. In order to qualify as an apprenticeship program, a training program must include at least - ANSWER 144 hours of technical instruction per year 22. The responsibility to document the working hours of an apprentice and provide it to the apprenticeship committee belongs to the.. - ANSWER Apprentice 23. Loyalty is an important quality .. - ANSWER For both employees and employers 24. The mast heights of mobile crane can approach.. - ANSWER 1,000 feet (213 meters) 25. Crane operation is always done in accordance with _____ 1910.179 standards - ANSWER OSHA 26. If you are issued a class 3A license you may operate all electric and air powered hoisting equipment except those which may also require a 1A license - ANSWER True 27. The safe working load of a hook is not reduced if the load is applied anywhere between the saddle in the tip of the hook - ANSWER False 28. What is the runway in which the crane runs across the plant called? - ANSWER Rails 29. What air pressure necessary for rated performance on air winches? - ANSWER Manufacturers specifications 30. All hooks shall have a _____ to retain swings and attachments - ANSWER Safety clip 31. Weight of Steel (lbs/cubic ft) - ANSWER 490 lbs/cubic ft 32. What to do when leaving Crane? - ANSWER No load on the hook Hook is up and back (15'x15') Power off Weathervane 33. How deep is the earthing rod? - ANSWER 1.5 meters or 5ft 34. Maximum Wind Speed for Personnel and Crane Operations - ANSWER 20 mph for Personnel 45mph for Crane operations 35. What is the minimum pitch diameter for load block sheaves - ANSWER Not less than 18 times the rope diameter 36. Luffing boom hoist running rope has a design factor of what? - ANSWER 3.5 to 1 37. Drum flanged shall not be less than ___ above the top layer of rope? - ANSWER 1/2 inch 38. What is the minimum pitch diameter for luffing boom hoist sheaves? - ANSWER Not less than 15 times rope diameter 39. Standard crane inspections shall be conducted by who? - ANSWER Designated person 40. Major crane inspections shall be conducted at __ year intervals? - ANSWER 5 year 41. Wire rope sling for personnel platform must be fabricated with what? - ANSWER A thimble in the eye 42. A crane hooks throat opening must not exceed what percent? - ANSWER 10%

Vista previa del contenido

New York Crane Operator Licensing
EXAM STUDY GUIDE 2026/2027
ACCURATE QUESTIONS WITH
CORRECT DETAILED SOLUTIONS ||
100% GUARANTEED PASS
<NEWEST VERSION>



1. What is a ant-two blocking device, and where is it located? - ANSWER ✔
it stops the hook from accidentally colliding with the boom tip.

its a cylinder located near top

2. Principle of leverage - ANSWER ✔ it is the weight diagram.

3. dynamic loading - ANSWER ✔ erratic or sudden movement of loads must
be avoided. always operate the crane in a smooth and controlled manner

4. parts of line - ANSWER ✔ the number of hoist ropes which appear to
directly support the lower load block or overhaul ball.

5. each hoist lowers the pulling force needed

6. high winds - ANSWER ✔ when wind exceeds 30mph, it is advised to
consider stopping the operation. However, load size, shape and weight could
require that the operation be stopped when wind speed is much less than
30mph

7. kinking - ANSWER ✔ when the rope turns

gets a "kink" in it

,8. what are 3 operational aids? - ANSWER ✔ 1. load weight or load moment
indicator
2. boom angle indicator
3. Anti two blocking device

9. the test answer is probably "load block"

10.OSHA requires that before being used, cranes which have been idle for 3+
months must.... - ANSWER ✔ be given a monthly inspection by a
qualified person

11.How must the crane be set up? talking about the tires - ANSWER ✔ all
tires must be relieved of the cranes weight

12.use of blocking - ANSWER ✔ ensure blockinbg is level and that the
outrigger pad is at 90 degrees to the stabilizer

13.required clearance for operations near high voltage power lines. Up to 50 kV
- ANSWER ✔ 10 feet

14.what do you do if your crane comes into contact with a power line -
ANSWER ✔ stay in the cab

15.What is the correct response to contact with a power line - ANSWER ✔ try
to disengage the crane from contact

16.Should you climb or jump off a crane, after it comes into contact with a
power line? - ANSWER ✔ JUMP. do not make contact with the crane and
the ground at the same time

17.how to climb on and off the crane - ANSWER ✔ always face the machine
when climbing on and off and maintain "three-point contact" at all times

18.What is the following ASME standards applies directly to mobile cranes? -
ANSWER ✔ ASME Standard B30.5

,19.The primary concern of every mobile crane operator must be.. - ANSWER
✔ Safety

20.Per OSHA standards, a mobile crane operator certification is valid for -
ANSWER ✔ 5 years

21.In order to qualify as an apprenticeship program, a training program must
include at least - ANSWER ✔ 144 hours of technical instruction per year

22.The responsibility to document the working hours of an apprentice and
provide it to the apprenticeship committee belongs to the.. - ANSWER ✔
Apprentice

23.Loyalty is an important quality .. - ANSWER ✔ For both employees and
employers

24.The mast heights of mobile crane can approach.. - ANSWER ✔ 1,000 feet
(213 meters)

25.Crane operation is always done in accordance with _____ 1910.179
standards - ANSWER ✔ OSHA

26.If you are issued a class 3A license you may operate all electric and air
powered hoisting equipment except those which may also require a 1A
license - ANSWER ✔ True

27.The safe working load of a hook is not reduced if the load is applied
anywhere between the saddle in the tip of the hook - ANSWER ✔ False

28.What is the runway in which the crane runs across the plant called? -
ANSWER ✔ Rails

29.What air pressure necessary for rated performance on air winches? -
ANSWER ✔ Manufacturers specifications

30.All hooks shall have a _____ to retain swings and attachments - ANSWER
✔ Safety clip

, 31.Weight of Steel (lbs/cubic ft) - ANSWER ✔ 490 lbs/cubic ft

32.What to do when leaving Crane? - ANSWER ✔ No load on the hook
Hook is up and back (15'x15')
Power off
Weathervane

33.How deep is the earthing rod? - ANSWER ✔ 1.5 meters or 5ft

34.Maximum Wind Speed for Personnel and Crane Operations - ANSWER ✔
20 mph for Personnel
45mph for Crane operations

35.What is the minimum pitch diameter for load block sheaves - ANSWER ✔
Not less than 18 times the rope diameter

36.Luffing boom hoist running rope has a design factor of what? - ANSWER
✔ 3.5 to 1

37.Drum flanged shall not be less than ___ above the top layer of rope? -
ANSWER ✔ 1/2 inch

38.What is the minimum pitch diameter for luffing boom hoist sheaves? -
ANSWER ✔ Not less than 15 times rope diameter

39.Standard crane inspections shall be conducted by who? - ANSWER ✔
Designated person

40.Major crane inspections shall be conducted at __ year intervals? - ANSWER
✔ 5 year

41.Wire rope sling for personnel platform must be fabricated with what? -
ANSWER ✔ A thimble in the eye

42.A crane hooks throat opening must not exceed what percent? - ANSWER
✔ 10%

Información del documento

Subido en
11 de mayo de 2026
Número de páginas
91
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$15.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
ProfBenjamin
3.7
(148)
Vendido
727
Seguidores
17
Artículos
3941
Última venta
17 horas hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes