OPMA 3306 FINAL EXAM REVIEW
QUESTIONS AND ANSWERS
A BOM file is also called which of the following - Correct Answers -Product Tree
MRP stands for Material Requirements Planning - Correct Answers -True
A project can be subdivided into which of the following - Correct Answers -work
packages
MRP is most valuable where a number of products are made in batches using the same
productive equipment - Correct Answers -True
PERT is an abbreviation for which of the following methodologies - Correct Answers -
Program Evaluation and Review Technique
How many free trade zones are there in the US - Correct Answers -about 260
A master production schedule is an input to a material requirements planning (MRP)
system - Correct Answers -True
An input to the material requirements planning (MRP) system is an exception report -
Correct Answers -False
Which of the following are eligible companies to be considered for the Baldrige award -
Correct Answers -auditing firms
An input to the material requirements planning (MRP) system is an inventory records file
- Correct Answers -True
MRP systems seek to achieve - Correct Answers -determine the number of dependent
demand items needed
A modular bill of materials includes items with fractional options - Correct Answers -
False
Which of the following is considered a primary report in an MRP system - Correct
Answers -Planned order schedules
Which of the following can be used or lot sizing in an MRP system - Correct Answers -
least unit cost
, The acronym ERP stands for - Correct Answers -Enterprise Resource Planning
Freezing the master schedule is - Correct Answers -done to avoid the chaos of
expediting and resultant overdue orders
An analytical tool used in six-sigma quality improvement programs is which of the
following - Correct Answers -checksheets
In monitoring process quality we might use which of the following statistics - Correct
Answers -difference between the highest and lowest value in a sample
Quality of life in a host community is not a major factor in making the facility location
decision - Correct Answers -False
AQL stands for accepting questionable lots in production quality management - Correct
Answers -False
Net change MRP systems are "activity" driven - Correct Answers -True
A BOM file is also called - Correct Answers -Product Tree
Which of the following should we use an "R" chart to monitor process quality - Correct
Answers -tire pressures in an auto assembly plant
In a net change MRP system requirements and schedules are considered rigid and
never updated - Correct Answers -False
What is a work breakdown structure - Correct Answers -A definition of the hierarchy of
project tasks, subtasks, and work packages
Low level coding in MRP indicates that exact status of each item managed by the
system in "real time" - Correct Answers -False
For which of the following should we use a "p" chart to monitor process quality - Correct
Answers -Defective electrical switches
Breakthrough projects are those that provide fundamental improvements to existing
products - Correct Answers -False
A lot for lot (L4L) lost sizing technique does not take into account setup costs or
capacity limitations - Correct Answers -True
"Projected available balance" is a term referring to unsold finished goods inventory -
Correct Answers -False
QUESTIONS AND ANSWERS
A BOM file is also called which of the following - Correct Answers -Product Tree
MRP stands for Material Requirements Planning - Correct Answers -True
A project can be subdivided into which of the following - Correct Answers -work
packages
MRP is most valuable where a number of products are made in batches using the same
productive equipment - Correct Answers -True
PERT is an abbreviation for which of the following methodologies - Correct Answers -
Program Evaluation and Review Technique
How many free trade zones are there in the US - Correct Answers -about 260
A master production schedule is an input to a material requirements planning (MRP)
system - Correct Answers -True
An input to the material requirements planning (MRP) system is an exception report -
Correct Answers -False
Which of the following are eligible companies to be considered for the Baldrige award -
Correct Answers -auditing firms
An input to the material requirements planning (MRP) system is an inventory records file
- Correct Answers -True
MRP systems seek to achieve - Correct Answers -determine the number of dependent
demand items needed
A modular bill of materials includes items with fractional options - Correct Answers -
False
Which of the following is considered a primary report in an MRP system - Correct
Answers -Planned order schedules
Which of the following can be used or lot sizing in an MRP system - Correct Answers -
least unit cost
, The acronym ERP stands for - Correct Answers -Enterprise Resource Planning
Freezing the master schedule is - Correct Answers -done to avoid the chaos of
expediting and resultant overdue orders
An analytical tool used in six-sigma quality improvement programs is which of the
following - Correct Answers -checksheets
In monitoring process quality we might use which of the following statistics - Correct
Answers -difference between the highest and lowest value in a sample
Quality of life in a host community is not a major factor in making the facility location
decision - Correct Answers -False
AQL stands for accepting questionable lots in production quality management - Correct
Answers -False
Net change MRP systems are "activity" driven - Correct Answers -True
A BOM file is also called - Correct Answers -Product Tree
Which of the following should we use an "R" chart to monitor process quality - Correct
Answers -tire pressures in an auto assembly plant
In a net change MRP system requirements and schedules are considered rigid and
never updated - Correct Answers -False
What is a work breakdown structure - Correct Answers -A definition of the hierarchy of
project tasks, subtasks, and work packages
Low level coding in MRP indicates that exact status of each item managed by the
system in "real time" - Correct Answers -False
For which of the following should we use a "p" chart to monitor process quality - Correct
Answers -Defective electrical switches
Breakthrough projects are those that provide fundamental improvements to existing
products - Correct Answers -False
A lot for lot (L4L) lost sizing technique does not take into account setup costs or
capacity limitations - Correct Answers -True
"Projected available balance" is a term referring to unsold finished goods inventory -
Correct Answers -False