OPMA 3306 FINAL EXAM REVIEW
QUESTIONS AND ANSWERS

A BOM file is also called which of the following - Correct Answers -Product Tree

MRP stands for Material Requirements Planning - Correct Answers -True

A project can be subdivided into which of the following - Correct Answers -work
packages

MRP is most valuable where a number of products are made in batches using the same
productive equipment - Correct Answers -True

PERT is an abbreviation for which of the following methodologies - Correct Answers -
Program Evaluation and Review Technique

How many free trade zones are there in the US - Correct Answers -about 260

A master production schedule is an input to a material requirements planning (MRP)
system - Correct Answers -True

An input to the material requirements planning (MRP) system is an exception report -
Correct Answers -False

Which of the following are eligible companies to be considered for the Baldrige award -
Correct Answers -auditing firms

An input to the material requirements planning (MRP) system is an inventory records file
- Correct Answers -True

MRP systems seek to achieve - Correct Answers -determine the number of dependent
demand items needed

A modular bill of materials includes items with fractional options - Correct Answers -
False

Which of the following is considered a primary report in an MRP system - Correct
Answers -Planned order schedules

Which of the following can be used or lot sizing in an MRP system - Correct Answers -
least unit cost

, The acronym ERP stands for - Correct Answers -Enterprise Resource Planning

Freezing the master schedule is - Correct Answers -done to avoid the chaos of
expediting and resultant overdue orders

An analytical tool used in six-sigma quality improvement programs is which of the
following - Correct Answers -checksheets

In monitoring process quality we might use which of the following statistics - Correct
Answers -difference between the highest and lowest value in a sample

Quality of life in a host community is not a major factor in making the facility location
decision - Correct Answers -False

AQL stands for accepting questionable lots in production quality management - Correct
Answers -False

Net change MRP systems are "activity" driven - Correct Answers -True

A BOM file is also called - Correct Answers -Product Tree

Which of the following should we use an "R" chart to monitor process quality - Correct
Answers -tire pressures in an auto assembly plant

In a net change MRP system requirements and schedules are considered rigid and
never updated - Correct Answers -False

What is a work breakdown structure - Correct Answers -A definition of the hierarchy of
project tasks, subtasks, and work packages

Low level coding in MRP indicates that exact status of each item managed by the
system in "real time" - Correct Answers -False

For which of the following should we use a "p" chart to monitor process quality - Correct
Answers -Defective electrical switches

Breakthrough projects are those that provide fundamental improvements to existing
products - Correct Answers -False

A lot for lot (L4L) lost sizing technique does not take into account setup costs or
capacity limitations - Correct Answers -True

"Projected available balance" is a term referring to unsold finished goods inventory -
Correct Answers -False

Información del documento

Subido en
10 de mayo de 2026
Número de páginas
6
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$12.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
millyphilip
3.6
(555)
Vendido
2955
Seguidores
1963
Artículos
45759
Última venta
17 horas hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes