Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

SOIL AND EROSION CONTROL QUESTIONS AND ANSWERS

Puntuación
-
Vendido
-
Páginas
14
Grado
A+
Subido en
01-05-2026
Escrito en
2025/2026

SOIL AND EROSION CONTROL QUESTIONS AND ANSWERS

Institución
NPDES
Grado
NPDES

Vista previa del contenido

SOIL AND EROSION CONTROL
QUESTIONS AND ANSWERS

National Pollutant Discharge Elimination System Permit - ans-
sq sq sq sq sq sq sq




Regulates storm water discharges and requires compliance with the General Permit; regul
sq sq sq sq sq sq sq sq sq sq sq




ates discharges from construction sites that disturb 1 acre or more of soil. Requires permite
sq sq sq sq sq sq sq sq sq sq sq sq sq sq




es to implement specific water quality sampling and analytical procedures.
sq sq sq sq sq sq sq sq sq




State Water Resources Control Board - ans-
sq sq sq sq sq sq




Issued the NPDES Permit, Statewide Storm Water Permit and Waste Discharge Requirem
sq sq sq sq sq sq sq sq sq sq sq




ents for the State of CA
sq sq sq sq sq




Water Pollution Control Program (WPCP) - ans-
sq sq sq sq sq sq




Includes a combination of soil stabilization and sediment controls.
sq sq sq sq sq sq sq sq




Construction Site BMP (temporary control practices) - ans-Best conventional/
sq sq sq sq sq sq sq sq




available technology, six categories: sq sq sq




1 - temporary soil stabilization
sq sq sq sq




2 - temporary sediment control
sq sq sq sq




3 - wind erosion control
sq sq sq sq




4 - tracking control
sq sq sq




5 - non-storm water Managment
sq sq sq sq




6 - waste Managment and materials pollution control
sq sq sq sq sq sq sq




Temporary Soil Stabilization Measures - ans- sq sq sq sq sq




Consists of preparing the soil surface and applying a BMP to disturbed soil areas.
sq sq sq sq sq sq sq sq sq sq sq sq sq




- Scheduling
sq




- Preservation of Existing Vegetation
sq sq sq sq




- Hydraulic Mulch
sq sq




- Hydroseeding
sq




- Soil Binders
sq sq




- Straw Mulch
sq sq




- Geotextiles, Plastic covers, and erosion control blankets/mats
sq sq sq sq sq sq sq




- Wood Mulching
sq sq




- Earth Dikes/Drainage Swales and Lined Ditches
sq sq sq sq sq sq




- Outlet Protection/Velocity Dissipation Devices
sq sq sq sq

, - Sloped Drains
sq sq




- Streambank Stabilization
sq sq




Scheduling - ans- sq sq




Developing a sequence of construction activities with implementation of BMPs; purpose is sq sq sq sq sq sq sq sq sq sq sq sq




to reduce the amount and duration of soil exposed to erosion by wind, rain, runoff, and vehi
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq




cle tracking. sq




BMP objectives: soil stabilization, sediment control, tracking control, wind erosion control,
sq sq sq sq sq sq sq sq sq sq sq




non-storm water management, materials and waste management. sq sq sq sq sq sq




Very first step in effective storm water program; shall clearly show how the rainy season rel
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq




ates to soil-disturbing and re-stabilization activities.
sq sq sq sq sq




Preservation of Existing Vegetation - ans- sq sq sq sq sq




Identification and protection of desirable vegetation that provides erosion and sediment co sq sq sq sq sq sq sq sq sq sq sq




ntrol benefits; limits of disturbance.
sq sq sq sq




BMP objective is for sediment control and non-storm water management.
sq sq sq sq sq sq sq sq sq




Temporary fencing shall be provided prior to clearing, especially on areas designation Envi
sq sq sq sq sq sq sq sq sq sq sq sq




ronmentally Sensitive Areas (ESAs); may limit the area available for construction activities. sq sq sq sq sq sq sq sq sq sq sq




Equipment and vehicles shall be kept away from trees; fires are not permitted within 100' of
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq




the drip line of any retained trees; no toxic or construction materials shall be stored within 5
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq




0 feet of the dripline of any retained trees.
sq sq sq sq sq sq sq sq




Trenching and Tunneling - ans- sq sq sq sq




Shall be as far away as possible, usually outside the dripline or canopy. Curve around trees
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq s




to avoid large roots.
q sq sq sq




If roots are encountered, consider tunneling under them, at least 18 inches below the groun
sq sq sq sq sq sq sq sq sq sq sq sq sq sq




d surface, and not below the tree center.
sq sq sq sq sq sq sq




Temporary Fencing - ans- sq sq sq




Orange polypropylene that is stabilized against ultraviolet light; shall be at least 1 meter (3.
sq sq sq sq sq sq sq sq sq sq sq sq sq sq




2 feet) tall, and shall have openings no larger than 2"x2".
sq sq sq sq sq sq sq sq sq sq sq




Fence posts shall be wood or metal, with adequate spacing to completely support fence in
sq sq sq sq sq sq sq sq sq sq sq sq sq sq sq




an upright position.sq sq




Removed last, after all other work is complete. sq sq sq sq sq sq sq




Hydraulic Mulch - ans- sq sq sq




Applying a mixture of shredded wood fiber and stabilizing emulsion or tackifier with hyrdos
sq sq sq sq sq sq sq sq sq sq sq sq sq




eeding equipment, which temporarily protects exposed soil from erosion by rain or wind.
sq sq sq sq sq sq sq sq sq sq sq sq

Escuela, estudio y materia

Institución
NPDES
Grado
NPDES

Información del documento

Subido en
1 de mayo de 2026
Número de páginas
14
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$14.99
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
DeligentSuccess Chamberlain College Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
18
Miembro desde
10 meses
Número de seguidores
1
Documentos
1024
Última venta
2 semanas hace
Deligent testbanks store:

Welcome to deligent success:where we offer high-quality test banks and study materials designed to help you excel academically. Deligent, hard work, perseverance, excellence are the values that cause things to happen.”

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes