Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

MAC3703 Assignment 2 2026 MEMO | Due 24 April 2026 - Distinction Guaranteed

Puntuación
-
Vendido
-
Páginas
23
Grado
A+
Subido en
24-04-2026
Escrito en
2025/2026

MAC3703 Assignment 2 2026 MEMO | Due 24 April 2026 - Distinction Guaranteed .

Institución
Grado

Vista previa del contenido

MAC3703 ASSIGNMENT 2 MEMO 2026

DUE 24 APRIL 2026




a) Critical evaluation of team performance with reference to Belbin's team roles
model


The respective Belbin roles of the team members suggest fundamental incompatibilities
which are hindering team performance (Learning Unit 10: Project Leadership; Kaplan,
2019:396-400).


 Team leader as Completer Finisher - This role is characterised by a close eye for
detail and a desire to see things finished. However, this leader depends on receiving
completed designs from the designers to perform their finishing work. When designs
are delayed, the leader becomes stressed and likely puts pressure on the designers.



 Designer 1 as Plant - This role is creative, full of imaginative ideas, but typically not
disciplined about producing useable ideas on time. Plants prefer freedom to think
creatively and may resist deadlines and structure.



 Designer 2 as Resource Investigator - This role is good at finding clever solutions
through discussions with others or external research. However, Resource Investigators
tend to lose interest quickly and want to move on to new challenges, potentially
leaving work incomplete.

, Draftsperson as second Completer Finisher - Having two Completer Finishers
creates additional pressure, as both are anxious to complete work but dependent on
the designers' output. The Draftsperson cannot complete their CAD work without
finished designs from the designers.



 Fundamental incompatibility: The creative, unstructured nature of the Plant and
Resource Investigator roles conflicts directly with the deadline-driven, completion-
focused needs of the Completer Finisher roles. The designers generate ideas but
fail to deliver useable outputs on time, while the leader and draftsperson require
finished work to perform their roles. This creates a stressful environment where the
leader must constantly pressure the designers, leading to conflict (Learning Unit 10:
Project Leadership, p. 29-30).



 John's role as Coordinator - Coordinators are good at delegating work and
coordinating activities, but this role may not be sufficiently hands-on to manage the
deep personality conflicts present in this team composition. Based on Belbin roles,
this would not be a team that would run to schedule without a good deal of assertive
hands-on management.



b) Advice on managing the conflict between the two designers and the team
leader (10 marks)



(Learning Unit 10, p. 30-31)



1. Arrange a meeting with all parties

, Schedule a face-to-face meeting with the team leader and both designers separately
initially, then together

Create a safe environment where each party can express their concerns without fear of
blame

Listen actively to understand the root causes of the conflict from each perspective



2. Identify the underlying issues

The designers likely feel micromanaged and that their creative process is being stifled

The team leader likely feels frustrated that work is not delivered on time, affecting his
ability to complete his own tasks

Clarify that the issue is systemic role incompatibility rather than personal



3. Clarify roles and expectations

Revisit each team member's role and responsibilities

Establish clear, agreed-upon deadlines for design delivery that balance creative needs
with project timelines

Document these expectations to prevent future misunderstandings



4. Implement a structured design review process

Establish regular check-in points where designers present work-in-progress

This provides the leader with visibility of progress without constant pressure

Allows for early identification of delays and collaborative problem-solving

Escuela, estudio y materia

Institución
Grado

Información del documento

Subido en
24 de abril de 2026
Número de páginas
23
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$4.76
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
UNIVIA University of South Africa (Unisa)
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
436
Miembro desde
1 año
Número de seguidores
3
Documentos
656
Última venta
15 horas hace
UNIVIA

On this page, you find all documents, package deals, and flashcards offered by seller UNIVIA.

3.6

39 reseñas

5
16
4
6
3
10
2
0
1
7

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes