Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 3 fuera de 28 páginas
Examen

Florida Electrical Business Actual Exam Study Guide with 100% Correct Answers Already Graded A+ | Latest Edition

Document preview thumbnail
Vista previa 3 fuera de 28 páginas

Florida Electrical Business Actual Exam Study Guide with 100% Correct Answers Already Graded A+ | Latest Edition 1. Subcontractor Termination - ANSWER Materials remain until subcontractor's work is complete 2. Excluded General Conditions - ANSWER Substitutions are not part of general conditions 3. Drug-Free Workplace Act - ANSWER Applies to contracts over $25,000, not always requiring testing 4. Florida DOT Legal Action Timeframe - ANSWER Must be brought within 720 days of work acceptance 5. When hoisting personnel, a safety factor of _______ should be used for rigging operations. a. 5 b. 10 c. 4 d. 12 - ANSWER c. 4 6. The number of employees that will require a contractor to obtain workmen's compensation insurance is __________ or more full or part time employee(s). a. One b. Two c. Four d. Ten - ANSWER a. one 7. The __________ usually prepares the project schedule. a. Architect b. Owner c. Project Manager d. Engineer - ANSWER c. Project manager 8. The type of insurance that covers the contractor for losses of material in transit or at temporary storage facilities is known as __________ insurance. a. Liability b. Builder's Risk c. Auto liability d. Fidelity bond - ANSWER b. Builder's Risk 9. If at all possible, sling angles should be kept greater than __________ degrees. a. 25 b. 45 c. 60 d. 90 - ANSWER b. 45 10. __________ days is the maximum time after commencing construction for the contractor to give notice to the owner of his lien rights. a. 30 b. 45 c. 60 d. 90 - ANSWER b. 45 11. Notice of Commencement Extension - ANSWER Written into the notice or job duration exceeds a year 12. Long Lead Items - ANSWER Needed items identified and ordered early for project 13. Fair Labor Standards Act - ANSWER Limits contractor's liability for overtime pay 14. Leasing Equipment Advantage - ANSWER Reduces front-end cash outlays for contractors 15. Sling Inspection Frequency - ANSWER Chains used as slings inspected once a month 16. Joint Venture Bidding - ANSWER Requires written agreement and approval for bidding 17. Completed Operations Liability - ANSWER Covers damages from finished work 18. Surety Bonding Principle - ANSWER Uses indemnity to spread losses among policy holders 19. License/Certification Requirement - ANSWER Includes number on business proposals 20. Cost-Plus Contract - ANSWER Negotiated and open-ended contract type 21. Compensatory Damages Limit - ANSWER Under Title VII, limited to $250,000 for 95+ employees 22. Secondary Qualifying Agent - ANSWER Supervises electrical contracting at specific sites 23. Real Estate Depreciation - ANSWER May use a straight-line or accelerated method 24. IRS Form 941 Filing Deadline - ANSWER Not later than November 10th for September quarter 25. Cost-Plus Contract Benefit - ANSWER Encourages cost savings and value engineering 26. Workers' Compensation Law Violation Penalty - ANSWER Up to $1,000 for accident reporting violations 27. Unemployment Compensation Benefit Limit - ANSWER Not to exceed $7,325 for eligible individuals 28. Notice to Owner Timing - ANSWER Sent within 45 days after first labor or materials 29. Business Interruption Insurance - ANSWER Recovers earnings lost due to building/equipment damage

Vista previa del contenido

Florida Electrical Business Actual Exam
Study Guide with 100% Correct Answers
Already Graded A+ | Latest Edition

1. Subcontractor Termination - ANSWER Materials remain until
subcontractor's work is complete


2. Excluded General Conditions - ANSWER Substitutions are not part of
general conditions


3. Drug-Free Workplace Act - ANSWER Applies to contracts over $25,000,
not always requiring testing


4. Florida DOT Legal Action Timeframe - ANSWER Must be brought within
720 days of work acceptance


5. When hoisting personnel, a safety factor of _______ should be used for
rigging operations.


a. 5
b. 10
c. 4
d. 12 - ANSWER c. 4


6. The number of employees that will require a contractor to obtain workmen's
compensation insurance is __________ or more full or part time
employee(s).
a. One

, b. Two
c. Four
d. Ten - ANSWER a. one


7. The __________ usually prepares the project schedule.


a. Architect
b. Owner
c. Project Manager
d. Engineer - ANSWER c. Project manager


8. The type of insurance that covers the contractor for losses of material in
transit or at temporary storage facilities is known as __________ insurance.
a. Liability
b. Builder's Risk
c. Auto liability
d. Fidelity bond - ANSWER b. Builder's Risk


9. If at all possible, sling angles should be kept greater than __________
degrees.
a. 25
b. 45
c. 60
d. 90 - ANSWER b. 45


10.__________ days is the maximum time after commencing construction for
the contractor to give notice to the owner of his lien rights.
a. 30
b. 45
c. 60
d. 90 - ANSWER b. 45

, 11.Notice of Commencement Extension - ANSWER Written into the notice or
job duration exceeds a year


12.Long Lead Items - ANSWER Needed items identified and ordered early for
project


13.Fair Labor Standards Act - ANSWER Limits contractor's liability for
overtime pay


14.Leasing Equipment Advantage - ANSWER Reduces front-end cash outlays
for contractors


15.Sling Inspection Frequency - ANSWER Chains used as slings inspected
once a month


16.Joint Venture Bidding - ANSWER Requires written agreement and
approval for bidding


17.Completed Operations Liability - ANSWER Covers damages from finished
work


18.Surety Bonding Principle - ANSWER Uses indemnity to spread losses
among policy holders


19.License/Certification Requirement - ANSWER Includes number on
business proposals


20.Cost-Plus Contract - ANSWER Negotiated and open-ended contract type

Información del documento

Subido en
20 de abril de 2026
Número de páginas
28
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$11.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
6
Seguidores
0
Artículos
905
Última venta
1 día hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes