18th Edition by Phil Simmons
b b b b b
CompleteChapterSolutionsManual are
b b b b
included (Ch 1 to 21)
b b b b b
** Immediate Download
b b
** Swift Response
b b
** All Chapters included
b b b
,Solution and Answer Guide b b b
SIMMONS/ODE, ELECTRICAL WIRING COMMERCIAL, 18E © 2024, 9780357767115; CHAPTER 1:
B B B B B B B B B
COMMERCIAL BUILDING PLANS AND SPECIFICATIONS
B B B B B B
TABLE OF CONTENTS B B
Review ....................................................................................................... 1
Note to instructor: It is recommended that students be required to respond, where appropriate,
b b b b b b b b b b b b b
with answers that are complete sentences.
b b b b b b
REVIEW
Refer to the National Electrical Code or the working drawings when necessary. Where
b b b b b b b b b b b b
applicable, responses should be written in complete sentences.
b b b b b b b b
1. What section of a commercial building’s specification contains a list of contract
b b b b b b b b b b b
documents?
b
Answer: A list of the contract documents is contained in General Clauses and
b b b b b b b b b b b b
Conditions. A listing of the Commercial Building contract documents is presented in
b b b b b b b b b b b b
this chapter under the heading “Commercial Building Plans.” The instructor may wish
b b b b b b b b b b b b
to have the students check over this listing and compare it with the plans provided.
b b b b b b b b b b b b b b b
2. The requirement for temporary light and power at the job site will be found in what
b b b b b b b b b b b b b b b
bportion of a commercial building’s specification?
b b b b b
Answer: The Supplementary General Conditions specifies the job site requirements for
b b b b b b b b b b
temporary light and power. In some contracts, this electrical system becomes the
b b b b b b b b b b b b
responsibility of the general contractor; in other contracts, it is the electrical
b b b b b b b b b b b b
contractor’s responsibility to install and maintain the temporary electrical system. The
b b b b b b b b b b b
instructor may wish to refer the student to NEC Article 590 and discuss the requirements
b b b b b b b b b b b b b b b
in detail.
b b
,3. The electrician uses the Schedule of Working Drawings for what purpose?
b b b b b b b b b b
Answer: The electrician uses the Schedule of Working Drawings to determine whether
b b b b b b b b b b b
all of the drawings are at hand. The information on “the other sheets” may be very
b b b b b b b b b b b b b b b b
important, especially in coordinating with other contractors.
b b b b b b b
4. Complete the following items by indicating the letter(s) designating the correct
b b b b b b b b b b
bsource(s) of information: b b
No. Answer Item Information
4. Sections Ceiling height b Sections, Sheet A6 b b
5. Electrical Electrical receptacle b Electrical symbol schedule, Chapter 2,
b b b b
symbol
b style
b Figure 2–6
b b
schedule
b
6. Electrical Electrical outlet b Electrical layout drawings, Sheets El, E2,
b b b b b
layout
b location
b and E3
b b
drawings
b
7. Elevations b Exterior wall finishes b b Elevations, Sheets A4 and A5 b b b b
8. Site plan b Grading elevations b Site plan, Sheet A4
b b b
9. Electrical Panelboard schedules b Electrical layout drawings, Sheet E4b b b b
layout
b
drawings
b
10. Architectural Room width b Architectural floor plan, Sheets Al, A2, b b b b b
floor plan
b b and A3
b b
11. Architectural Swing of door b b Architectural floor plan, Sheets Al, A2, b b b b b
floor plan
b b and A3
b b
12. Sections View of interior wall b b b Sections, Sheet A6 b b
Match the items on the left with those on the right by writing the letter designation of
b b b b b b b b b b b b b b b b
the appropriate organization from the list on the right.
b b b b b b b b b
13. NEC Electrical Code b National Electrical Code (NEC)
b b b
14. IAEI Electrical inspectors b International Association of Electrical b b b
Inspectors (IAEI)
b b
, 15. NFPA Fire codes b National Fire Protection Association b b b
(NFPA)
b
16. IESNA Lighting information b Illuminating Engineering Society of b b b
North America (IESNA)
b b b
17. UL Listing service b Underwriters Laboratories, Inc. (UL) b b b
18. NEMA Manufacturers’ National Electrical Manufacturers b b
standards
b Association (NEMA)
b b
19. PE Seal Professional Engineer (PE) b b
Match the items on the left with those on the right by writing the letter designation of
b b b b b b b b b b b b b b b b
the proper level of NEC interpretation from the list on the right.
b b b b b b b b b b b b
20. with special b Allowed by the Code b b b Shall be permitted, or Shall not be
b b b b b b
permission
b required, NEC
b b
21. with special b May be done b b Shall be permitted, or Shall not be
b b b b b b
permission
b required, NEC
b b
22. shall Must be done b b Shall, National Electrical Code
b b b
23. shall Required by the Code b b b Shall, National Electrical Code
b b b
24. never Up to the electrician
b b b Shall be permitted, or Shall not be
b b b b b b
required, NEC
b b
25. Find NEC 250.52(A)(5) and record the first four words.
b b b b b b b b
Answer: The first four words of NEC 250.52(A)(5) are Rod and pipe electrodes.
b b b b b b b b b b b b
Show required conversion calculations for problem 26 and problem 27.
b b b b b b b b b
26. Luminaire style F is four feet long. The length in SI units, as specified by the NEC, is
b b b b b b b b b b b b b b b b b
Answer: The length in SI units is 1.22 m; 4 ft × 0.3048 m/ft = 1.2192 m. As will be discussed
b b b b b b b b b b b b b b b b b b b b
later, this luminaire is now called a 4 by 2 or the equivalent 1200 by 600 in metric
b b b b b b b b b b b b b b b b b b
terms. This question assumes that the luminaire is exactly 4 ft long.
b b b b b b b b b b b b
27. The gross area of the drugstore basement is 1395 square feet. The area in square
b b b b b b b b b b b b b b
meters is
b b
Answer: The area in SI units is 129.7 sq. m; 1395 sq. ft × 0.093 sq. m/sq. ft = 129.7 sq. m.
b b b b b b b b b b b b b b b b b b b b b