COR TRAINING QUESTIONS AND ANSWERS
2025 26 MASTER LEVEL READINESS CHECK
◉ Select all listed documentation CORs will maintain in their COR file
throughout the life of a contract. Answer: A) Correspondences with the
contractor and KO.
B) When assigned, evidence that the 450 OGE is completed annually.
C) Evidence CPARs input has been verified on service contracts.
D) Contract deliverables.
◉ Completed COR status reports (CSR), Surveillance Schedules, and
Checklists must be uploaded to the Surveillance and Performance
Monitoring (SPM) by the 30th of each month. Answer: False
◉ The QASP: Answer: B) Will include a completed schedule and
checklist.
C) Is prepared in conjunction with the Statement of Work (SOW)
◉ Match the question with the correct response option below: Answer:
Who nominates a COR? = RA
Who assigns and authorizes COR responsibilities? = KO
What is COR implied authority based upon? = Appointment Letter
◉ After the end of the Evaluation Period, within how many days are all
CPARS inputs due? Answer: 120
, ◉ Supporting surveillance documentation is not required before
acceptance or approval of products/supplies. Answer: True
◉ The Quality Assurance Specialists support the KO in assessing,
determining, and documenting contractor and COR performance and
contract administration? Answer: True
◉ CORs have implied authority to make commitments or changes that
will affect price, quality, quantity, delivery, or any other term or
conditions of the contract? Answer: False
◉ Which of the following contractor requests should the COR involve
the KO? Answer: A) Request for changes in period of performance.
B) Request for price increase.
C) Request for change in quantity or delivery schedule.
◉ Government inspections constitute or imply acceptance? Answer:
False
◉ On construction contracts, who is responsible for ensuring all
necessary inspections and tests are performed to corroborate that the
supplies or services conform to contract requirements? Answer:
Contractor
2025 26 MASTER LEVEL READINESS CHECK
◉ Select all listed documentation CORs will maintain in their COR file
throughout the life of a contract. Answer: A) Correspondences with the
contractor and KO.
B) When assigned, evidence that the 450 OGE is completed annually.
C) Evidence CPARs input has been verified on service contracts.
D) Contract deliverables.
◉ Completed COR status reports (CSR), Surveillance Schedules, and
Checklists must be uploaded to the Surveillance and Performance
Monitoring (SPM) by the 30th of each month. Answer: False
◉ The QASP: Answer: B) Will include a completed schedule and
checklist.
C) Is prepared in conjunction with the Statement of Work (SOW)
◉ Match the question with the correct response option below: Answer:
Who nominates a COR? = RA
Who assigns and authorizes COR responsibilities? = KO
What is COR implied authority based upon? = Appointment Letter
◉ After the end of the Evaluation Period, within how many days are all
CPARS inputs due? Answer: 120
, ◉ Supporting surveillance documentation is not required before
acceptance or approval of products/supplies. Answer: True
◉ The Quality Assurance Specialists support the KO in assessing,
determining, and documenting contractor and COR performance and
contract administration? Answer: True
◉ CORs have implied authority to make commitments or changes that
will affect price, quality, quantity, delivery, or any other term or
conditions of the contract? Answer: False
◉ Which of the following contractor requests should the COR involve
the KO? Answer: A) Request for changes in period of performance.
B) Request for price increase.
C) Request for change in quantity or delivery schedule.
◉ Government inspections constitute or imply acceptance? Answer:
False
◉ On construction contracts, who is responsible for ensuring all
necessary inspections and tests are performed to corroborate that the
supplies or services conform to contract requirements? Answer:
Contractor