TRAFFIC SUPERVISOR EXAM QUESTIONS WITH CORRECT
ANSWERS UPDATED 2026.
When cones are substituted for drums for nighttime closers, what is the minimum cone height
requirement?

A. 18"

B. 28"

C. 36"

D. 42"

42"

When cones are substituted for drums at nighttime closer, what is the maximum cone spacing?

A. 20'

B. 30'

C. 40'

D. 50'

40'

What type of flashing warning lights are required when there is a nighttime lane closer?

A. ROAD WORK AHEAD

B. LANE CLOSED AHEAD

C. A & B

D. NONE OF THE ABOVE

ROAD WORK AHEAD

&

LANE CLOSED AHEAD

If there is a lane closure of greater than three days, what is required?

A. Work zone dotted lines, 4' in length separated by 10' gaps, shall be provided to identify the merge.

B. The appropriate color work zone edge lines shall be applied along the taper and tangent sections.

C. All the above

D. None of the above

The appropriate color work zone edge lines shall be applied along the taper and tangent sections.

Page 1 of 59

,Work zone pavement marking that conflict with final traffic lanes shall be temporary paint.

A. True

B. False

False

What are the extra advance warning signs?

A. Lane Close Ahead

B. Watch for Stopped Traffic

C. Road Work Ahead

D. All the above

Lane Change Ahead

&

Watch for Stopped Traffic

&

Road Work Ahead

Is the advisory speed plaque used in all traffic zones?

A. True

B. False

False

When the approach speed limit is 40 mph or less, 36" warning signs may be used.

A. True

B. False

True

Road Work Ahead signs shall be provided on entrance ramps or roadways entering the work limits.

A. True

B. False

True



Is a shadow vehicle used in all traffic zones?

A. True

Page 2 of 59

,B. False

False

The shadow vehicle is occupied whenever workers are in the work area.

A. True

B. False

False

What class one light is the shadow vehicle equipped with?

A. Flashing Yellow Light

B. Oscillating Yellow Light

C. Yellow Strobe Light

D. All of the above

All of the above

When may cones be substituted for drums?

A. Daytime traffic control minimum height 18"

B. Daytime traffic control minimum height 28"

C. Daytime traffic control minimum height 36"

D. Daytime traffic control minimum height 42"

Daytime traffic control minimum height 28"

When may cones be substituted for drums?

A. Daytime traffic control minimum height 18"

B. Daytime traffic control minimum height 28"

C. Daytime traffic control minimum height 36"

D. Daytime traffic control minimum height 42"

Daytime traffic control minimum height 28"

End Road Work signs are only required for lane closures of more than ______ day.

A. 1

B. 2

C. 3

D4

Page 3 of 59

, 1

Sign spacing should be adjusted to avoid conflict with existing signs, minimum spacing to existing signs
shall be 200' for speeds of 45 mph or less and a minimum of 400' for speeds 50 mph or greater.

A. True

B. False

True

The minimum acceptable length for the merge taper shall be determined by _________ the width of the
offset by the merge taper rate.

A. Subtracting

B. Adding

C. Divide

D. Multiplying

Multiplying

The tangent (recovery area) section between the two merge tapers should be 2 times longer of the two
merge tapers.

A. True

B. False

True

What is a fundamental principle of temporary traffic control?

A. To inconvenience motorists as much as possible so they will find another route.

B. To guide and direct motorists through or around the work area as efficiently as possible. C. To make
traffic move as slow as possible.

D. All of the above are fundamental principles.

To guide and direct motorists through or around the work area as efficiently as possible.

What needs to be done when work is suspended for any length of time?

A. Take down the ROAD WORK AHEAD sign

B. Cover up the END ROAD WORK sign

C. Erect a WORK SUSPENDED sign

D. Cover or remove the FLAGGER AHEAD sign

Cover or remove the FLAGGER AHEAD sign


Page 4 of 59

Escuela, estudio y materia

Grado

Información del documento

Subido en
4 de abril de 2026
Número de páginas
59
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$17.88
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor
Seller avatar
smithclaggercole

Conoce al vendedor

Seller avatar
smithclaggercole WINSCOIN
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
2
Miembro desde
8 meses
Número de seguidores
0
Documentos
136
Última venta
3 meses hace

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes