Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

CM 2113 Wang Test 2 – 50 Exam Questions & Verified Answers (Updated 2026)

Puntuación
-
Vendido
-
Páginas
14
Grado
A+
Subido en
02-04-2026
Escrito en
2025/2026

CM 2113 Wang Test 2 – 50 Exam Questions & Verified Answers (Updated 2026)CM 2113 Wang Test 2 – 50 Exam Questions & Verified Answers (Updated 2026)CM 2113 Wang Test 2 – 50 Exam Questions & Verified Answers (Updated 2026)vv

Institución
CM 2113 Wang
Grado
CM 2113 Wang

Vista previa del contenido

CM 2113 Wang Test 2 – 50 Exam Questions & Verified
Answers (Updated 2026)


Exam Questions & 100% Verified Revised Answers (Updated)

Course: CM 2113 – Construction Project Management & Controls
Instructor: Professor Wang
Test: 2 (Mid-term coverage: Scheduling, Cost Control, Resource Management, Risk)




Section I – Multiple Choice (30 points)

1. In a Critical Path Method (CPM) network, the activity that has zero total float is called a:
A) Dummy activity
B) Critical activity
C) Slack activity
D) Free-float activity

Answer: B) Critical activity
Revised explanation: Critical activities have zero total float; any delay extends the project
duration.



2. Which of the following is a direct cost in a construction project?
A) Office rent for the home office
B) Project manager’s salary allocated to the job site
C) Depreciation of company-wide equipment
D) Advertising for new projects

Answer: B) Project manager’s salary allocated to the job site
Revised explanation: Direct costs are specifically attributable to a project (labor, materials,
equipment, site supervision). Home office overhead is indirect.



3. If an activity has an Early Start (ES) of day 5, Late Start (LS) of day 8, and duration of 3
days, the Total Float is:
A) 0
B) 3
C) 5
D) 8

Answer: B) 3
*Calculation: Total Float = LS – ES = 8 – 5 = 3 days.*

, 4. In resource leveling, the primary goal is to:
A) Minimize project duration
B) Reduce the critical path
C) Smooth resource demand within available limits
D) Increase the number of activities in parallel

Answer: C) Smooth resource demand within available limits
Revised explanation: Resource leveling shifts non-critical activities to avoid peaks and
valleys, keeping usage within capacity.



5. Which contract type places the greatest risk on the owner?
A) Lump Sum
B) Guaranteed Maximum Price (GMP)
C) Cost Plus Fixed Fee
D) Unit Price

Answer: C) Cost Plus Fixed Fee
Revised explanation: Owner pays all actual costs plus a fee; cost overruns are borne by the
owner.



Section II – Short Answer (40 points)

6. Define the term “Total Float” and explain why it is important for schedule compression.

Answer:
Total Float is the amount of time an activity can be delayed without delaying the project
completion date. It is calculated as LS – ES or LF – EF.
Importance for schedule compression: Activities with float can be delayed or used to shift
resources to critical activities. When compressing (crashing) a schedule, you focus on critical
activities (zero float) first because reducing their duration directly shortens the project.



7. List four typical components of an Earned Value Management (EVM) report and give the
formula for Cost Performance Index (CPI).

Answer:
Components:

• Planned Value (PV)

• Earned Value (EV)

• Actual Cost (AC)

• Budget at Completion (BAC)

CPI formula:

CPI=EVACCPI=ACEV

CPI > 1 indicates under budget; CPI < 1 indicates over budget.

Escuela, estudio y materia

Institución
CM 2113 Wang
Grado
CM 2113 Wang

Información del documento

Subido en
2 de abril de 2026
Número de páginas
14
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$16.39
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
cephasmuriithi Walden University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
90
Miembro desde
2 año
Número de seguidores
7
Documentos
716
Última venta
4 horas hace
EXAM NAVIGATOR

Welcome to your premier destination for high-yield nursing exam resources. Our store is built by experienced nursing educators and top-performing graduates who understand exactly what it takes to pass rigorous nursing assessments. Our Commitment to You: We provide more than just notes—we provide a roadmap to success. Whether a student is preparing for entrance exams or final clinicals, our resources are designed to build confidence and deliver results.

Lee mas Leer menos
3.9

15 reseñas

5
9
4
0
3
3
2
1
1
2

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes