A customer contacts a manufacturer's salesperson and wants to purchase all production
supply and capacity for a given item. Which of the following values will the salesperson
need to obtain from his company to respond to his customer? - answer Capable-to-
promise

What is the term for the process of validating the master production schedule against
available demonstrated capacity? - answer Rough-cut capacity planning

The level of detail for the master production schedule is: - answer developed for
individual items.

Which of the following describes the process of order entry? - answer Accepting and
translating what a customer wants into terms used by the manufacturer or distributor

Which of the following is the term for the uncommitted portion of a company's inventory
and planned production maintained in the master schedule to support customer order
promising? - answerAvailable-to-promise

The portion of inventory and planned production that can be committed to customer
orders typically is referred to as the: - answeravailable-to-promise quantity.

In a bill of material, the path that adds up to the greatest number of lead time periods
defines the: - answercumulative lead time.

If there is insufficient capacity for the priority plan for a period of the master schedule
and this overload is based on actual customer orders, what solution might be most likely
to succeed and should be attempted first? - answerAdd an evening shift for equipment
that is fully staffed on the current shift

If the projected available balance would go negative in a period, what should be done? -
answerSchedule a master production schedule receipt for that period.

Which of the following uses a format that includes time periods, the forecast, customer
orders, projected available balance, and available-to-promise? - answermaster
schedule

What is the portion of inventory or production that has yet to be assigned to specific
customer orders? - answerAvailable-to-promise

Rough-cut capacity planning (RCCP) checks which of the following data? -
answercritical resources

, When multiple products are produced using the same resources over the same time
horizon, what must an organization do prior to checking capacity? - answerAggregate
master schedules for all related items.

In relation to time fences, in which of the following zones can scheduling software make
automatic adjustments without the input of the master scheduler? - answerliquid zone

Item A is produced using the following components, and each has lead times as shown:
A (1 week), B (2 weeks), C (2 weeks), D (5 weeks), E (3 weeks), F (1 week), and G (5
weeks). If the following choices represent all of the possible paths through the product
tree, what is the longest cumulative lead time for use in calculating the planning
horizon? - answerA-C-G

The information needed to develop a master schedule will come from which source? -
answerForecast of individual end items

Which is an objective of a master production schedule? - answerMaintain the targeted
level of customer service.

Open shop orders and purchase orders are primary inputs to which of the following
activities? - answermaterial requirements planning

What document shows the component parts and number of components needed to
make one unit of the part? - answerbill of material

Determining what is required, how much is required, and when it is required is a key
function of what manufacturing planning and control process? - answermaterial
requirements planning

What type of material requirements planning (MRP) system lists the actual date for
actions/events and omits periods of inactivity? - answerbucketless

How do gross requirements differ from net requirements? - answerGross requirements
do not consider available inventory or scheduled receipts.

What is the name of the set of priority planning techniques for planning component
items below the end-item level? - answerMaterial requirements planning

When a customer orders a laptop online and selects from a variety of different options,
such as RAM, hard disk space, color, etc., an order entry system will produce a
modular: - answerbill of material

A product is made from two widgets, but the bill of material shows only one. Which of
the following results can be expected? - answerMaterial requirements will be
understated in the material requirements plan.

Información del documento

Subido en
30 de marzo de 2026
Número de páginas
6
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$16.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
julianah420
4.2
(157)
Vendido
711
Seguidores
328
Artículos
35863
Última venta
5 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes