Conveyors Questions with Complete
Solutions.
A Certified Person is ________________. - Answer An individual who has passed certain
requirements set forth for operating cranes as outlined by an accrediting organization such as
NCCCO and CIC.
A Competent person is ________________. - Answer An individual who is capable of
identifying existing and predictable hazards in the surroundings or working conditions which are
unsanitary, hazardous or dangerous to employees, and who has authority to take prompt
corrective measures to eliminate them.
NCCA stands for _____________. - Answer National Commission for Certifying Agencies
No crane or hoist shall be placed in service on a Turner project until ________________ and
supplemental reports are submitted to Turner indicating that the crane or hoist meets the
manufacturer's inspection criteria. - Answer -An annual third party inspection
If the manufacturer's inspection criterion does not exist, ______________, familiar with crane
or hoist's design and dynamics, may develop or use existing inspection criteria - Answer -A
structural engineer
Turner requires all contractors using cranes to have a _____________ completed on site after
the crane is set up, prior to use and quarterly thereafter. This does NOT include small delivery
cranes 5 TONS in capacity or less. Documentation of this inspection must be submitted to
Turner. - Answer 3rd-party inspection
__________ or ____________ will require the 3rd party inspector to be on the jobsite the
entire time of this activity. The inspector will review the PTP, be part of any daily crew meetings,
inspect the workers equipment/tools, and the crane parts and pieces as it is being
erected/jumped. - Answer -Tower crane erection
-Jumping a section of the crane
Turner requires all crane operators be experienced on the model of crane to be operated and
certified by __________ or _________ for that model. Copies of their certifications must be
submitted to Turner. If other licensing is required by state or local agencies to operate a crane,
the operator's credentials will be required for review by Turner prior to mobilization. - Answer
- the National Commission for Certification of Crane Operators (NCCCO)
, - Crane Institute of America
Any lift exceeding ___ of the cranes rated chart capacity (as configured), or lifts involving ____
or more cranes, or some other operation with exceptional level of risk shall be considered a
critical lift. A critical lift plan must be submitted to Turner supervision for review prior to the lift.
- Answer -75%
-2
A pre-planning meeting to discuss the critical lift will be held in the field with the crew to
discuss, at a minimum, what 5 topics? - Answer -Calculation of gross weight load
-Load chart calculations
-Radius measurements anticipated during the lift
-Weather and soil conditions
-Overhead high voltage power line clearances.
Calculations for the lift are to be reviewed during this meeting.
The swing radius of cranes must be ________ at all times while working on site. - Answer
Properly barricaded
Wire rope, its attachments, fittings, sheaves and safety devices must be inspected
________________. Copies of the inspections must be submitted to Turner. - Answer
According to the manufacturer's recommendations.
Wedge sockets and fittings must be the proper size to match the wire rope and must move to
hold the wire rope _______. The dead end must be terminated according to ANSI B30.5 and
must not be attached, in any manner, to the _________. - Answer -Under load
- Live side of the load line.
An _______ device is required on all lifting lines except those engaged in driving piles. - Answer
Anti two-block
A qualified and certified rigger must inspect the rigging ___(When?)____. Only qualified and
certified riggers may rig on this project. - Answer Prior to each shift
All windows in cabs must be ________ that produces no visible distortion that will interfere
with the safe operation of the machine. - Answer Safety glass