100% de satisfacción garantizada Inmediatamente disponible después del pago Leer en línea o como PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

Cranes, Derricks, Hoists, Elevators, Conveyors Questions with Complete Solutions.

Puntuación
-
Vendido
-
Páginas
6
Grado
A+
Subido en
19-03-2026
Escrito en
2025/2026

A Certified Person is ________________. - Answer An individual who has passed certain requirements set forth for operating cranes as outlined by an accrediting organization such as NCCCO and CIC. A Competent person is ________________. - Answer An individual who is capable of identifying existing and predictable hazards in the surroundings or working conditions which are unsanitary, hazardous or dangerous to employees, and who has authority to take prompt corrective measures to eliminate them. NCCA stands for _____________. - Answer National Commission for Certifying Agencies No crane or hoist shall be placed in service on a Turner project until ________________ and supplemental reports are submitted to Turner indicating that the crane or hoist meets the manufacturer's inspection criteria. - Answer -An annual third party inspection If the manufacturer's inspection criterion does not exist, ______________, familiar with crane or hoist's design and dynamics, may develop or use existing inspection criteria - Answer -A structural engineer Turner requires all contractors using cranes to have a _____________ completed on site after the crane is set up, prior to use and quarterly thereafter. This does NOT include small delivery cranes 5 TONS in capacity or less. Documentation of this inspection must be submitted to Turner. - Answer 3rd-party inspection __________ or ____________ will require the 3rd party inspector to be on the jobsite the entire time of this activity. The inspector will review the PTP, be part of any daily crew meetings, inspect the workers equipment/tools, and the crane parts and pieces as it is being erected/jumped. - Answer -Tower crane erection -Jumping a section of the crane Turner requires all crane operators be experienced on the model of crane to be operated and certified by __________ or _________ for that model. Copies of their certifications must be submitted to Turner. If other licensing is required by state or local agencies to operate a crane, the operator's credentials will be required for review by Turner prior to mobilization. - Answer - the National Commission for Certification of Crane Operators (NCCCO)

Mostrar más Leer menos
Institución
NCCCO Lift Director Certification
Grado
NCCCO Lift Director Certification

Vista previa del contenido

Cranes, Derricks, Hoists, Elevators,
Conveyors Questions with Complete
Solutions.
A Certified Person is ________________. - Answer An individual who has passed certain
requirements set forth for operating cranes as outlined by an accrediting organization such as
NCCCO and CIC.



A Competent person is ________________. - Answer An individual who is capable of
identifying existing and predictable hazards in the surroundings or working conditions which are
unsanitary, hazardous or dangerous to employees, and who has authority to take prompt
corrective measures to eliminate them.



NCCA stands for _____________. - Answer National Commission for Certifying Agencies



No crane or hoist shall be placed in service on a Turner project until ________________ and
supplemental reports are submitted to Turner indicating that the crane or hoist meets the
manufacturer's inspection criteria. - Answer -An annual third party inspection



If the manufacturer's inspection criterion does not exist, ______________, familiar with crane
or hoist's design and dynamics, may develop or use existing inspection criteria - Answer -A
structural engineer



Turner requires all contractors using cranes to have a _____________ completed on site after
the crane is set up, prior to use and quarterly thereafter. This does NOT include small delivery
cranes 5 TONS in capacity or less. Documentation of this inspection must be submitted to
Turner. - Answer 3rd-party inspection



__________ or ____________ will require the 3rd party inspector to be on the jobsite the
entire time of this activity. The inspector will review the PTP, be part of any daily crew meetings,
inspect the workers equipment/tools, and the crane parts and pieces as it is being
erected/jumped. - Answer -Tower crane erection



-Jumping a section of the crane



Turner requires all crane operators be experienced on the model of crane to be operated and
certified by __________ or _________ for that model. Copies of their certifications must be
submitted to Turner. If other licensing is required by state or local agencies to operate a crane,
the operator's credentials will be required for review by Turner prior to mobilization. - Answer
- the National Commission for Certification of Crane Operators (NCCCO)

, - Crane Institute of America



Any lift exceeding ___ of the cranes rated chart capacity (as configured), or lifts involving ____
or more cranes, or some other operation with exceptional level of risk shall be considered a
critical lift. A critical lift plan must be submitted to Turner supervision for review prior to the lift.
- Answer -75%



-2



A pre-planning meeting to discuss the critical lift will be held in the field with the crew to
discuss, at a minimum, what 5 topics? - Answer -Calculation of gross weight load

-Load chart calculations

-Radius measurements anticipated during the lift

-Weather and soil conditions

-Overhead high voltage power line clearances.



Calculations for the lift are to be reviewed during this meeting.



The swing radius of cranes must be ________ at all times while working on site. - Answer
Properly barricaded



Wire rope, its attachments, fittings, sheaves and safety devices must be inspected
________________. Copies of the inspections must be submitted to Turner. - Answer
According to the manufacturer's recommendations.



Wedge sockets and fittings must be the proper size to match the wire rope and must move to
hold the wire rope _______. The dead end must be terminated according to ANSI B30.5 and
must not be attached, in any manner, to the _________. - Answer -Under load



- Live side of the load line.



An _______ device is required on all lifting lines except those engaged in driving piles. - Answer
Anti two-block



A qualified and certified rigger must inspect the rigging ___(When?)____. Only qualified and
certified riggers may rig on this project. - Answer Prior to each shift



All windows in cabs must be ________ that produces no visible distortion that will interfere
with the safe operation of the machine. - Answer Safety glass

Escuela, estudio y materia

Institución
NCCCO Lift Director Certification
Grado
NCCCO Lift Director Certification

Información del documento

Subido en
19 de marzo de 2026
Número de páginas
6
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$12.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Leer en línea o como PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TestSolver9 Webster University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
835
Miembro desde
2 año
Número de seguidores
126
Documentos
27451
Última venta
1 día hace
TESTSOLVER9 STORE

TOPNOTCH IN LEARNING MATERIALS,(EXAMS,STUDYGUIDES NOTES ,REVIEWS,FLASHCARDS ,ALL SOLVED AND PACKAGED.OUR STORE MAKE YOUR EDUCATION JOURNEY EFFICIENT AND EASY.WE ARE HERE FOR YOU FEEL FREE TO REACH US OUT .

3.6

151 reseñas

5
67
4
19
3
25
2
12
1
28

Documentos populares

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes