Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

ICC GR Test Questions with all Correct & 100% Verified Answers |Latest Version |Already Graded A+

Puntuación
-
Vendido
-
Páginas
6
Grado
A+
Subido en
17-03-2026
Escrito en
2025/2026

ICC GR Test Questions with all Correct & 100% Verified Answers |Latest Version |Already Graded A+

Institución
Icc General Requirements
Grado
Icc general requirements

Vista previa del contenido

ICC GR Test Questions with all Correct & 100% Verified
Answers |Latest Version |Already Graded A+

What does the special inspection agreement state? ✔Correct Answer-The owner or registered
design professional hired an approved special inspection agency

A preconstruction meeting is ✔Correct Answer-Initiated by the general contractor

What risk category would an elementary school. OST likely belong to? ✔Correct Answer-III

Who produces the statement of responsibility? ✔Correct Answer-contractor

Who approves the special inspection agency? ✔Correct Answer-Building official

A typical commercial building would likely fall under which risk category? ✔Correct Answer-II

What is one of the duties of a special inspector prior to arriving at the job site? ✔Correct Answer-
Discuss reporting frequency with the building official

Who notifies the special inspector of upcoming inspection tasks? ✔Correct Answer-The contractor

What is something you would find in a statement of responsibility? ✔Correct Answer-Method and
frequency of reporting as well as distribution of the reports

It is up to the ___ to conduct a preconstruction meeting, while it can fall on the ___ to require one.
✔Correct Answer-RDP, Building Official

When considering a special inspection form for a project, the owner should evaluate: ✔Correct
Answer-The firms experience with similar size and scope projects, whether the form has enough
qualified inspectors in the projects prominent disciplines, how close the firms office is to the job site

The ___ is ultimately responsible for the special inspection program ✔Correct Answer-RDP

The ___ is responsible for excepting or approving alternate materials or design methods proposed
for use in construction that deviate from that specifically stated in the construction documents
✔Correct Answer-Building Official

The ___ is tasked with monitoring and even auditing the special inspection activities on the job site
✔Correct Answer-Building Official

Special inspectors are expected to be an expert in ✔Correct Answer-Reinforced concrete,
structural masonry, and or soils

An example of material and construction requiring special inspection would be ✔Correct Answer-
The grout of masonry walls, nailing type parters and locations in a wood diaphragm, and the
application of fire stopping material

Special inspectors become approved in a jurisdiction by ✔Correct Answer-Following the
requirements of the jurisdiction over the project

, The statement of special inspections can't address ✔Correct Answer-What QC manual is in place
for a non approved fabricator

Discussions about the frequency of reporting from the special inspection agency should be handled
ultimately with ✔Correct Answer-The building department, to understand how frequently they
want to receive, and review the reporting and to whom the reports should go as the project contact

According to the international building code, there are four risk categories which any building will fall
under. This statement is true ✔Correct Answer-A building with a higher risk to life safety will
require more inspection

Alternate materials, not originally designed or prescribed in. The code are permitted for use on a
project, provided the material is not less in equivalence in ✔Correct Answer-Quality, strength, and
fire resistance

According to the special inspection manual, a manufacturer who wants to use a new or alternate
product than what has been prescribed by the IBC, will typically apply for an evaluation report if the
product has been available for ___ or more years ✔Correct Answer-5

According to the special inspection, manual Quality Control differs from quality assurance in that
✔Correct Answer-Qu control refers to procedures completed during the manufacturing of a product
to insurance specific level of quality is in place, well quality assurance refers to the verification by a
third-party agency of a products compliance.

The building department is responsible for overseeing a number of tasks that pertain to special
inspection. Ultimately assuring they're being adequately performed. This includes: ✔Correct
Answer-Sufficient staffing of competent, qualified personnel, the major players understand the
responsibilities, setting approval criteria for the inspectors.

The duties of a special inspector include all of the following ✔Correct Answer-Review the approved
plans and specifications for special inspection requirements, inspect work for compliance with the
building department, approved plans, notifying writing, a report to be seen by the building official an
engineer of record of unresolved deviations

When reporting nonconforming items, all of the following items must be in the report ✔Correct
Answer-Name, entitled of each individual notified, reference to applicable detail of approved, plans,
job, specifications, or code, resolution, or corrective action taken

Depending upon the jurisdiction, the special inspector is required to send the final report to the
building official, and ✔Correct Answer-The design professional in responsible charge

The responsibility of ensuring that day today work is covered by inspections falls on ✔Correct
Answer-The contractor

When the special inspector arrived on site, they should notify the ✔Correct Answer-Contractor

The ___ issues final acceptance of a building ✔Correct Answer-The building official

It is the responsibility of the ___ to monitor the special inspection activities ✔Correct Answer-The
building official

Escuela, estudio y materia

Institución
Icc general requirements
Grado
Icc general requirements

Información del documento

Subido en
17 de marzo de 2026
Número de páginas
6
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$14.99
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Studyclub Yale School Of Medicine
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
49
Miembro desde
1 año
Número de seguidores
1
Documentos
10924
Última venta
2 días hace
"The Club for Top Academic Performance."

Welcome to StudyClub—the ultimate destination for students who want to make studying not only effective but also enjoyable! Whether you’re preparing for an exam, looking to improve your grades, or mastering new subjects, StudyClub is your go-to space to find the tools and resources you need to succeed. At StudyClub, I believe in the power of community. That’s why I’ve created a collection of high-quality study materials designed to simplify complex concepts and help you achieve your academic goals. Whether you’re an individual looking to study independently or a student seeking the support of a virtual study group, you’ll find everything you need to succeed. Join the StudyClub today, where learning is made easier, more organized, and—most importantly—more collaborative. Let’s grow together, learn smarter, and unlock your academic potential. Thank you for being part of the StudyClub community. I can’t wait to see you succeed!

Lee mas Leer menos
3.6

13 reseñas

5
6
4
1
3
3
2
1
1
2

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes