Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

ICC General Requirements (GR) exam Prep COMPLETE QUESTIONS AND ANSWERS | ALREADY PASSED | 2025 LATEST!!

Puntuación
-
Vendido
-
Páginas
21
Grado
A+
Subido en
16-03-2026
Escrito en
2025/2026

ICC General Requirements (GR) exam Prep COMPLETE QUESTIONS AND ANSWERS | ALREADY PASSED | 2025 LATEST!!

Institución
ICC General Requirements
Grado
ICC General Requirements

Vista previa del contenido

ICC General Requirements (GR) exam Prep COMPLETE
QUESTIONS AND ANSWERS | ALREADY PASSED | 2025
LATEST!!
The (_________) can designate another person to oversee the special inspector, but that person
may not be the (__________). - Answer - Owner, Contractor


Special inspections apply principally to the : - Answer - structural framing system of the
building.


The structural framing system includes: - Answer - the foundation, walls and columns, floors and
beams, and roof.


Some nonstructural components, used for (_______________), require special inspection as
well. - Answer - Fire safety


The ICC catalog entry for the Special Inspector General Requirements (GR) module states that
this is an _____ exam. Indicating it is a _____ test type. - Answer - "Open Book" , navigational


Navigational means knowing where to find the answer is just as important as knowing the
answer. There is not enough time to look up every question.


The ICC catalog entry for the General Requirements (GR) module shows additional information
under _____ and _____ . Reference materials allowed during the exam are The _____ and The
_____ . This exam will focus on _____ , _____ , and _____ . - Answer - Info and Outline


International Building Code (IBC) , Special Inspection Manual (SIM)


"Duties and Responsibilities" , "Notification of Discrepancies" , and "Inspection Reports"


The type and extent of each special inspection shall be located in - Answer - the Statement of
"Special Inspections"

,IBC 1704.3.1


Who has the legal authority to enforce the "Special Inspections" provisions of the building code?
- Answer - building official


SIM 2012 Ch 3 "Duties and Responsibilities of the Building Official"


Who can hire an approved inspection agency? - Answer - Owner or owners agent


IBC 1704.2
The type and extent of each special inspection shall be located in - Answer - The statement of
special inspection


Who has the legal authority to enforce the special inspection provisions of the building code -
Answer - Building official


Who can hire an approved inspection agency - Answer - Owners agent


Who can perform a structural observation - Answer - Registered design professional


Who is required to receive the final report - Answer - Building department


All of the following should be performed by the special inspector on the job site except - Answer
- Stop work when non-conforming items are observed


Who is responsible for providing access to the approved plans - Answer - General contractor


Who shall the special inspector demonstrate competence to - Answer - Building official

, Who can issue a stop work order - Answer - Building official


What type of inspection is required for post installed adhesive anchors (epoxy) placed in a
horizontal position into an existing 4000 PSI concrete wall - Answer - Continuous special
inspection


Which of the following does not need to be on a daily report containing non-conforming items -
Answer - A proposed solution from the special inspector


Discrepancies should be brought to the Immediate attention of the - Answer - Contractor


Foundation walls built per table 1807.1.6.2 require what extent of special inspection - Answer -
None at all


Who must a special inspector notify of their presence on a job site - Answer - Contractor


When must the statement of special inspection be submitted - Answer - For permit issuance


The special inspector is required to verify all of the following except - Answer - Design data for
concrete mix and approve it


A ____________________ is a classification assigned to a structure based on its risk category
and the severity of the design earthquake ground motion at the site - Answer - Seismic design
category


A special inspector is responsible for all of the following except - Answer - Submitting RFI's


Placement of 3000 PSI concrete for grade beams and sampling to fabricate strength specimens
requires what type of special inspection - Answer - Continuous

Escuela, estudio y materia

Institución
ICC General Requirements
Grado
ICC General Requirements

Información del documento

Subido en
16 de marzo de 2026
Número de páginas
21
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$28.49
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor
Seller avatar
ExamGeek01

Conoce al vendedor

Seller avatar
ExamGeek01 Chamberlain College Of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
-
Miembro desde
4 meses
Número de seguidores
0
Documentos
79
Última venta
-

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes