Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

C-39 ROOFING TRADE EXAM VERSION 3 LATEST ACTUAL EXAM WITH COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (100% VERIFIED ANSWERS) |ALREADY GRADED A+| ||PROFESSOR VERIFIED|| ||BRANDNEW!!!||

Puntuación
-
Vendido
-
Páginas
17
Grado
A+
Subido en
13-03-2026
Escrito en
2025/2026

C-39 ROOFING TRADE EXAM VERSION 3 LATEST ACTUAL EXAM WITH COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (100% VERIFIED ANSWERS) |ALREADY GRADED A+| ||PROFESSOR VERIFIED|| ||BRANDNEW!!!||

Institución
C-39 ROOFING TRADE
Grado
C-39 ROOFING TRADE

Vista previa del contenido

1|Page


C-39 ROOFING TRADE EXAM VERSION 3 LATEST 2026-2027 ACTUAL
EXAM WITH COMPLETE QUESTIONS AND CORRECT DETAILED
ANSWERS (100% VERIFIED ANSWERS) |ALREADY GRADED A+|
||PROFESSOR VERIFIED|| ||BRANDNEW!!!||

The maximum allowable deck deflection for a 5-ft span under a
concentrated load of 300 lb is: - ANSWER-0.25 inches



The maximum allowable deck deflection for a 6-ft span under a
concentrated load of 300 lb is: - ANSWER-0.30 inches



Roof deflection is important for proper roof drainage. It should be
limited to no more than ________ of the roof span. - ANSWER-
1/240



A deck span of 50 ft should deflect no more than: - ANSWER-3"



A deck span of 75 ft should deflect no more than: - ANSWER-3-
3/4"



Drains on roof surfaces should be located: - ANSWER-At points
of maximum deflection (e.g ., at midspan)

,2|Page




Expansion joints are required and should always be provided: -
ANSWER-Where steel framing, structural steel, or decking
changes direction and



Where the type of decking changes and



Where additions are connected to existing building



Maintaining a roughly level line between a drain above a rigid roof
support (e.g. a column) and a 2-1/2" midspan deflection requires
raising the other roof support: - ANSWER-5"



Area dividers for attached membrane systems are generally
required at intervals of: - ANSWER-150-200 ft



Composition base flashing should extend at least _______
(nominal) above the roof line. - ANSWER-8"

, 3|Page


Good practice requires that _______ be placed around all roof
penetrations. - ANSWER-Curbs



The upper layer of roof insulation should be installed with
_______ dimension of the insulation boards placed in a
continuous line and the end joints _______. - ANSWER-The long
... staggered



When installing preformed roof insulation over steel decks, the
second layer should be attached with: - ANSWER-Hot asphalt



Which of the following statement is correct regarding preformed
roof insulation? - ANSWER-The upper layer should have a
greater insulation value



A bituminous-membrane vapor retarder is typically installed as: -
ANSWER-A two-ply installation with three moppings of Steep
asphalt

Escuela, estudio y materia

Institución
C-39 ROOFING TRADE
Grado
C-39 ROOFING TRADE

Información del documento

Subido en
13 de marzo de 2026
Número de páginas
17
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$25.99
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor
Seller avatar
GRADELOOMEXAMS

Conoce al vendedor

Seller avatar
GRADELOOMEXAMS Chamberlain College of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
5
Miembro desde
4 meses
Número de seguidores
0
Documentos
1149
Última venta
1 mes hace
RELIABLE TUTOR

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes