CM 1011 Notes Laison Gilbert Questions With Complete Solutions
Commercial construction includes: - (ANSWER)Bank, schools, Hotels, Shopping malls, Government
buildings.
F. ALL OF THE ABOVE
Who are the primary players in a construction project? - (ANSWER)Owners,
Design Professionals,
Construction Professionals
What is the name of the weekly magazine dedicated solely to the construction industry? -
(ANSWER)Engineering News Record (ENR)
By whom was the first form of concrete used? - (ANSWER)Romans
Sub-contractors, sub-sub-contractors and sub-sub-sub-contractors under the prime contractor are
entities that directly affect the project and are classified as: - (ANSWER)1st Level of the Secondary
Players
An onsite safety plan should cover any and all possible safety problems inherent with the type of
construction at that site. This is part of: - (ANSWER)Managing Safety
Many construction companies will rotate their new hires through a number of tracks. The entry level in
the field track is the: - (ANSWER)Field Engineer
What sums up the role of an Area Superintendent? - (ANSWER)Assists the Project Superintendent on
large projects
The primary materials used in commercial construction include: - (ANSWER)steel, concrete, glass,
marble, granite, acoustic ceilings.
ALL OF THE ABOVE
, CM 1011 Notes Laison Gilbert Questions With Complete Solutions
What is lean construction? - (ANSWER)Philosophy that focuses on adding value with less work and the
elimination of waste in the building process.
Which of the following is terminology used regarding the in-office work done by the contractor to assist
the actual construction work done in the field? - (ANSWER)Administering the Contract
All of the following are functions of Construction Management except:
A.Financing the project
B.Planning the project
C.Scheduling the project
D.Estimating the project - (ANSWER)A. Financing the project
Because of early involvement of the construction entity with the planning phase, these two project
delivery methods are similar:
A. Design/build and at-risk CM
B. Design /bid/build and at-risk CM
C. Design/build and Design /bid/build - (ANSWER)A. Design/Build and at-risk CM
Who determines what method of delivery is used on a project? - (ANSWER)Owner
The factors to consider when choosing the delivery method include: - (ANSWER)Cost, time, quality,
design, risk-tolerance, and Owner construction expertise
Which of the following is terminology used regarding used regarding the onsite work done by the
contractor? - (ANSWER)Managing Construction Operations
An estimate is a best-guess of the costs of materials, equipment, and labor to the contractor to do the
project and it includes:
A.General overhead items
B.Profit
Commercial construction includes: - (ANSWER)Bank, schools, Hotels, Shopping malls, Government
buildings.
F. ALL OF THE ABOVE
Who are the primary players in a construction project? - (ANSWER)Owners,
Design Professionals,
Construction Professionals
What is the name of the weekly magazine dedicated solely to the construction industry? -
(ANSWER)Engineering News Record (ENR)
By whom was the first form of concrete used? - (ANSWER)Romans
Sub-contractors, sub-sub-contractors and sub-sub-sub-contractors under the prime contractor are
entities that directly affect the project and are classified as: - (ANSWER)1st Level of the Secondary
Players
An onsite safety plan should cover any and all possible safety problems inherent with the type of
construction at that site. This is part of: - (ANSWER)Managing Safety
Many construction companies will rotate their new hires through a number of tracks. The entry level in
the field track is the: - (ANSWER)Field Engineer
What sums up the role of an Area Superintendent? - (ANSWER)Assists the Project Superintendent on
large projects
The primary materials used in commercial construction include: - (ANSWER)steel, concrete, glass,
marble, granite, acoustic ceilings.
ALL OF THE ABOVE
, CM 1011 Notes Laison Gilbert Questions With Complete Solutions
What is lean construction? - (ANSWER)Philosophy that focuses on adding value with less work and the
elimination of waste in the building process.
Which of the following is terminology used regarding the in-office work done by the contractor to assist
the actual construction work done in the field? - (ANSWER)Administering the Contract
All of the following are functions of Construction Management except:
A.Financing the project
B.Planning the project
C.Scheduling the project
D.Estimating the project - (ANSWER)A. Financing the project
Because of early involvement of the construction entity with the planning phase, these two project
delivery methods are similar:
A. Design/build and at-risk CM
B. Design /bid/build and at-risk CM
C. Design/build and Design /bid/build - (ANSWER)A. Design/Build and at-risk CM
Who determines what method of delivery is used on a project? - (ANSWER)Owner
The factors to consider when choosing the delivery method include: - (ANSWER)Cost, time, quality,
design, risk-tolerance, and Owner construction expertise
Which of the following is terminology used regarding used regarding the onsite work done by the
contractor? - (ANSWER)Managing Construction Operations
An estimate is a best-guess of the costs of materials, equipment, and labor to the contractor to do the
project and it includes:
A.General overhead items
B.Profit