CMIT Exam (200 multiple choice) Questions With Complete Solutions

Institución
Cmit
Grado
Cmit

Vista previa del contenido

CMIT Exam (200 multiple choice) Questions With Complete
Solutions

21.
In a CM-at-Risk arrangement once construction begins and the
CM converts from the professional advisory role of a CM to the
contractual role of a general contractor, the CM has no implied
duties of loyalty and care to the owner.
True False Correct Answers True

A 5D BIM model incorporates which project attribute?
A) Schedule
B) Quality
C) Phasing
D) Cost Correct Answers D) Cost

A CM must be aware of its contractual obligations regarding
safety on the project site.
True False Correct Answers True

A CM must purchase insurance coverage for protection against
claims by its own employees.
True False Correct Answers True

A CM response/proposal to an owner's request for proposal can
be considered an offer to enter into a contract.
True False Correct Answers True

A CM should seek the advice of legal counsel when preparing or
modifying contracts.
True False Correct Answers True

,A CM under an agency relationship, with the owner managing
multi-prime contractors, must consider its own risk first in
managing those contractors.
True False Correct Answers True

A CM, acting as an agent of the owner, will bond a multi-prime
job.
True False Correct Answers False

A CM's liability is determined solely by whether or not the CM
performed according to the required standard of care.
True False Correct Answers False

A CM's role and responsibilities are governed solely by the
Owner/CM Agreement.
True False Correct Answers True

A contract is an arrangement for the distribution of construction
project risk between the parties.
True False Correct Answers True

A cost plus fixed fee contract is what type of contract?
A) Cost reimbursement
B) Lump sum
C) Time & material
D) Unit price Correct Answers A) Cost reimbursement

A Dispute Review Board does not meet until there is a dispute.
True False Correct Answers False

,A general contractor working under a fixed price contract will
always put its interests ahead of the owner.
True False Correct Answers True

A guaranteed maximum price can never change.
True False Correct Answers False

A key advantage of the traditional delivery approach is:
A) With the traditional delivery system, the cost of the
construction phase is known before construction starts.
B) Facility features are fully determined & specified.
C) When the construction contract is signed, the major risk
belongs to the contractor.
D) All of the above Correct Answers B) Facility features are
fully determined & specified.

A key element leading to successful project management is
decision making based on adequate information.
True False Correct Answers True

A legal relationship by which one party is empowered and
obligated to act on behalf of another party is called:
A) An agreement
B) Agency
C) Addenda
D) A contract Correct Answers B) Agency

A limitation provision seeks to limit a party's liability to the
party's client.
True False Correct Answers True

, A mediator cannot impose an agreement upon the parties.
True False Correct Answers True

A method of compensation that creates a potential for conflict of
interest between the owner's interests and the CM's interests is
indicative of an agency CM relationship.
True False Correct Answers False

A mini-trial, whether required by contract or agreed to
voluntarily, results in a binding decision.
True False Correct Answers False

A project delivery approach that is gaining acceptance for
allocating risks among project teams is referred to as the
________ method.
A) D-B
B) IPD
C) FAR
D) D-B-B Correct Answers B) IPD

A project management system that utilizes a periodic consistent
measurement of work performed in terms of budget is known as
a ____________ system?
A) CPM
B) ISO
C) Earned value
D) Value engineering Correct Answers C) Earned value

A project schedule must always be in a CPM format.
True False Correct Answers False

Escuela, estudio y materia

Institución
Cmit
Grado
Cmit

Información del documento

Subido en
1 de marzo de 2026
Número de páginas
38
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$19.49
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Classroom NURSING
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
4827
Miembro desde
4 año
Número de seguidores
3229
Documentos
55038
Última venta
11 horas hace
NURSING

Assignments, Case Studies, Research, Essay writing service, Questions and Answers, Discussions etc. for students who want to see results twice as fast. I have done papers of various topics and complexities. I am punctual and always submit work on-deadline. I write engaging and informative content on all subjects. Send me your research papers, case studies, psychology papers, etc, and I’ll do them to the best of my abilities. Writing is my passion when it comes to academic work. I’ve got a good sense of structure and enjoy finding interesting ways to deliver information in any given paper. I love impressing clients with my work, and I am very punctual about deadlines. Send me your assignment and I’ll take it to the next level. I strive for my content to be of the highest quality. Your wishes come first— send me your requirements and I’ll make a piece of work with fresh ideas, consistent structure, and following the academic formatting rules. For every student you refer to me with an order that is completed and paid transparently, I will do one assignment for you, free of charge!!!!!!!!!!!!

Lee mas Leer menos
4.0

1177 reseñas

5
622
4
214
3
193
2
39
1
109

Documentos populares

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes