Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 5 páginas
Examen

FRS-205 Building Construction for Fire Protection with all Correct & 100% Verified Answers |Latest Version |Already Graded A+

Document preview thumbnail
Vista previa 2 fuera de 5 páginas

FRS-205 Building Construction for Fire Protection with all Correct & 100% Verified Answers |Latest Version |Already Graded A+

Vista previa del contenido

FRS-205 Building Construction for Fire Protection with
all Correct & 100% Verified Answers |Latest Version |
Already Graded A+

It is essential that you have a working knowledge of how buildings are designed, constructed,_____,
and altered and how they fall into disrepair? ✔Correct Answer-Renovation

With regard to language, what is the most critical factor for all the fire departments? ✔Correct
Answer-Clear communication

In 1989, an Avian airliner crashed on Long Island, New York. What is the major contributing factor?
✔Correct Answer-Language

At times the term "withdraw in good order" is used by fire depts. This is a military term, and its
meaning is ____ appropriate in fire scenarios? ✔Correct Answer-not

What two elements does using correct language show? ✔Correct Answer-professionalism and
safety

When using proper terminology, what two elements can you convey? ✔Correct Answer-Building
characteristics and building hazards

Fire figures are reduced to just reacting to a fire rather than being prepared for its many potential
hazards if they do not do what? ✔Correct Answer-conduct prefer plans

Why would it be more beneficial to separate prefer planning and the inspection function?
✔Correct Answer-because inspections are essentially a policing function

What is the basic objective of prefer planning? ✔Correct Answer-to consider potential emergency
situations and develop the best possible plans for coping with them

What new technology has been introduced to the fire service and is used during he preplanning
process? ✔Correct Answer-GIS

Which of the following factors has increased the danger to today's fire fighters? ✔Correct Answer-
changes in the company staffing and use the lightweight construction

What is known as the eternal enemy of every building? ✔Correct Answer-Gravity

The term KIP is an engineering calculation that means ____ pounds? ✔Correct Answer-1000

Which NFPA code is the Building Construction and Safety Code? ✔Correct Answer-5000

A nut on a bolt defines what type of force? ✔Correct Answer-Torsion

A residential structure will usually be designed for a floor load of about ___ pounds per square foot?
✔Correct Answer-30-40

, Any substitute structural element that is of less mass than the element previously used to carry an
equivalent load is said to be? ✔Correct Answer-inherently less fire resistant

____ loads can be accurately calculated while ____ loads are indeterminate? ✔Correct Answer-
Dead, live

The uniform "live load" column refers to loads distributed over the entire areas. Which load is for a
specific large object? ✔Correct Answer-Concentrated

What type of load was exerted on the twin towers by the jetliner attacks on September 11, 2001?
✔Correct Answer-Impact load

Some walls are designed to accept vertical _____ loads? ✔Correct Answer-compressive

Which loads are applied slowly and remain constant? ✔Correct Answer-static

Floors that are designed to stiffen the building against wind and other lateral loads are what type of
floors? ✔Correct Answer-Diaphragm floors

Which code regulates the activities that take place in new construction as well as existing buildings?
✔Correct Answer-fire codes

_____ spell out what types of buildings can be built in specific locations in a city and what they can
be used for? ✔Correct Answer-Zoning regulations

Who is the lead person in the building design process? ✔Correct Answer-Architect

Which engineering designs the layout of the site, including parking, drainage, and roadways?
✔Correct Answer-Civil engineering

A certificate of occupancy cannot be issued until? ✔Correct Answer-all code regulations have been
fulfilled

Preliminary site work involves testing the soil for quantity and? ✔Correct Answer-load-bearing
capacity

Structures that will be erected on very weak soils may need to use deep foundations such as _____
and _____? ✔Correct Answer-piles and caissons

Which of the following will protect walls in the excavation process from collapsing? ✔Correct
Answer-Crosslot bracing, rakers, tiebacks (all of the above)

Which term defines a foundation wall in an excavation that is heavily reinforced with steel and
temporarily filled with a liquid slurry mixture that is subsequently displaced by concrete? ✔Correct
Answer-Slurry Wall

The ____ is/are used to support poured concrete during the curing process? ✔Correct Answer-
falsework or tiebacks (either A or B)

What is one of the major problems with the renovation process of an older building? ✔Correct
Answer-The prospect of a new occupancy classification

Información del documento

Subido en
27 de febrero de 2026
Número de páginas
5
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$12.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Studyclub
3.6
(14)
Vendido
60
Seguidores
1
Artículos
12299
Última venta
1 semana hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes