Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

VA DEQ ESC LATEST FINAL EXAM WITH DETAILED QUESTIONS AND 100% VERIFIED ANSWERS WITH RATIONALE ALREADY A+ GRADED

Puntuación
-
Vendido
-
Páginas
40
Grado
A+
Subido en
21-02-2026
Escrito en
2025/2026

VA DEQ ESC LATEST FINAL EXAM WITH DETAILED QUESTIONS AND 100% VERIFIED ANSWERS WITH RATIONALE ALREADY A+ GRADED

Institución
VA DE ESC
Grado
VA DE ESC

Vista previa del contenido

VA DEQ ESC LATEST FINAL EXAM WITH DETAILED QUESTIONS
AND 100% VERIFIED ANSWERS WITH RATIONALE ALREADY A+
GRADED



VESCP

Virginia Erosion and Sediment Control Program



- Administered by counties/cities (must), towns (may)

- MUST BE APPROVED




Minimum Standard 1

Stabilization



permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final
grade is reached on any portion of the site; temporary soil stabilization shall be applied within seven
days to denuded areas that may not be at final grade but will remain dormant for longer than 14 days;
permanent stabilization shall be applied to areas that are to be left dormant for more than one year




Site NOT at Final Grade

- stabilize in 14 days

- temporarily seed

- mulch

- permanently stabilize if dormant > 1 year

,Site at Final Grade

- stabilize in 7 days (recommended immediately)

- permanently or temporarily seed and mulch

- mulch/matting/straw




Minimum Standard 2

Stock Piles, Waste and Borrow Areas



during construction, soil stock piles and borrow areas shall be stabilized or protected with sediment
trapping measures



mulch prevents erosion by protecting the surface from raindrop impact and silt fence intercepts and
detains from disturbed areas




Minimum Standard 3

Permanent Vegetation



permanent vegetation cover shall be established on denuded areas not otherwise permanently
stabilized (permanent vegetation shall not be considered established until a ground cover is achieved
that is uniform, mature enough to survive, and will inhibit erosion there is no % associated with this)



reduce erosion and decrease sediment yield from disturbed area

,this is the standard used to verify that a site is ready for release of bonds or surety




Minimum Standard 4

First-Step Measures



Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap
sediment shall be constructed as a first step in any land-disturbing activity and shall be made functional
before upslope land disturbance takes place



a certain amount of initial land disturbance may be required to provide access for equipment to install
the perimeter controls, but site clearing and grading should be kept to a minimum until the perimeter
controls are in place



intercepts and detains small amounts of sediment from disturbed areas during construction operation
to prevent sediment from leaving the site and decrease velocity of sheet flows and low-to-moderate
level channel flow




Perimeter Controls

assures that sediment does not leave the perimeter of the land-disturbing area once site clearing,
grading, and construction commences



Examples: silt fences, sediment traps, sediment basins, construction entrance, temporary diversions,
diversions




Minimum Standard 5

Earthen Structure Stabilization

, stabilization measures shall be applied to earthen structures such as dams, dikes, and diversions
immediately after installation



reduce erosion and sedimentation and reduce damage from sediment and runoff to downstream or off-
site areas




Minimum Standard 6

Traps and Basins



sediment traps and basins shall be designed and constructed based upon the total drainage area (not
just disturbed area) to be served by the trap or basin




Sediment Traps

minimum storage capacity shall be 134 cubic yards per acre of drainage area and shall only control
drainage areas less than 3 acres



stone outlet = trap




Sediment Basins

surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal
to 3 acres shall be controlled by a basin; minimum storage capacity of a sediment basin shall be 134
cubic yards per acre of drainage area; the outfall system shall, at a minimum, maintain the structural
integrity of the basin during a 25-year storm of 24-hour duration; runoff coefficients used in runoff
calculations shall correspond to a bare earth condition or those conditions expected to exist while the
sediment basin is utilized.

Escuela, estudio y materia

Institución
VA DE ESC
Grado
VA DE ESC

Información del documento

Subido en
21 de febrero de 2026
Número de páginas
40
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$21.49
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor
Seller avatar
SILENTLECTURER
1.0
(1)

Conoce al vendedor

Seller avatar
SILENTLECTURER Chamberlain College Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1
Miembro desde
1 año
Número de seguidores
0
Documentos
87
Última venta
3 meses hace

1.0

1 reseñas

5
0
4
0
3
0
2
0
1
1

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes