Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 4 fuera de 87 páginas
Examen

Gas fitter 2 practice test 360+ ( Full Exam Kit) Solved Q&A Correct & Verified Answers

Document preview thumbnail
Vista previa 4 fuera de 87 páginas

Gas fitter 2 practice test 360+ ( Full Exam Kit) Solved Q&A Correct & Verified Answers

Vista previa del contenido

GAS FITTER 2 PRACTICE
TEST

360+ (2025-2026 Full Exam Kit) Solved
Q&A | Correct & Verified Answers


100% Guarantee Pass




✓ This Exam contains: Gas fitter 2 practice test

✓ 100% Accurate Questions and Answers

✓ 100% Guarantee Pass - Verified by Experts

✓ Each Question Includes The Correct Answer

✓ Expert-Verified




Trusted by thousands of students and professionals worldwide Page 1 of 87

,Question 1
A room heater installed in either a sleeping area or public area shall be:
A. direct vent only
B. equipped with a regulator
C. equipped with a fan
D. equipped with an on / off switch on the wall
Correct Answer
B


Question 2
What type of vent must be used when the vent of a wall furnace will be concealed in a partition wall?
A. B vent
B. L vent
C. BH vent
D. BW vent
Correct Answer
D

Question 3
Single wall vent connectors:
A. may pass through floors, ceilings or roofs provided a metal thimble is used
B. may pass through floors, ceilings or roofs provided the required minimum distance from combustible material is
maintained
C. may pass through floors, ceilings or roofs provided they are insulated
D. shall not pass through floors, ceilings or roofs
Correct Answer
D

Question 4
BW vent shall be used only with an approved:
A. decorative appliance
B. down flow furnace
C. revertible flue boiler
D. recessed wall furnace
Correct Answer
D

Question 5
What must be done during the installation of a gas log fireplace?
A. Make sure there is a metal mesh screen in front of the fireplace
B. Secure the chimney damper in the open position
C. Install a pressure regulator
D. Install a metal chimney liner
Correct Answer
B


Trusted by thousands of students and professionals worldwide Page 2 of 87

,Question 6
When can a certified hose be used to connect a construction heater to temporary piping?
A. Only if a lever handle shut off valve is installed upstream of the hose
B. Only if the hose is 15 feet long
C. Never
Correct Answer
A

Question 7
Which of the following is acceptable when a fireplace insert is installed?
A. A metal chimney linear
B. The existing fireplace flue
C. BW vent
D. A tile lined fireplace flue?
Correct Answer
A

Question 8
An unvented infra-red heater can be installed in ________ application
A. A warehouse
B. A commercial building
C. An industrial building
D. All of the above
Correct Answer
D

Question 9
Dirt pockets are required on:
A. Decorative appliances
B. Gas logs
C. Room heaters
D. None of the available choices
Correct Answer
D

Question 10
What diameter and length of a dirt pocket is required when a drop line is 3-inch diameter?
A. 3 inch diameter by 3 inches long
B. 1 inch diameter by 3 inches long
C. 3/4 inch diameter by 3 inches long
D. 2 inch diameter by 3 inches long
Correct Answer
D




Trusted by thousands of students and professionals worldwide Page 3 of 87

, Question 11
What type of room heater maybe installed in a bathroom?
A. Natural draft
B. Direct fired
C. Forced draft
D. Direct vent
Correct Answer
D


Question 12
What safety control protects a steam boiler if the condensate pump fails to return water to the boiler?
A. High pressure limit control
B. Low pressure limit control
C. Flame safeguard control
D. Low water cut off
Correct Answer
D

Question 13
The relief valve for a residential low-pressure hot water boiler system should be?
A. 14.7 psia
B. 15 psia
C. 30 psig
D. 30 psia
Correct Answer
C


Question 14
A backflow prevent used in a boiler system should be located in the:
A. Over flow line connected to the drain
B. Return line close to the boiler
C. 1/4" line connecting the boiler and cushion tank
D. Make up water line to the system
Correct Answer
B

Question 15
Automatic chlorinators must be installed:
A. upstream of the heater
B. downstream of the heater
C. upstream of the filter
D. downstream of the filter
Correct Answer
B





Trusted by thousands of students and professionals worldwide Page 4 of 87

Información del documento

Subido en
20 de febrero de 2026
Número de páginas
87
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$11.02

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
LectScotty
4.1
(21)
Vendido
114
Seguidores
4
Artículos
2827
Última venta
11 horas hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes