DBIA Test QUESTIONS AND ANSWERS 100% RATED CORRECT WITH 100% SURE PASS|GRADED A+

Document preview thumbnail
Vista previa 2 fuera de 14 páginas

DBIA Test QUESTIONS AND ANSWERS 100% RATED CORRECT WITH 100% SURE PASS|GRADED A+

Vista previa del contenido

DBIA Test QUESTIONS AND
ANSWERS 100% RATED CORRECT
WITH 100% SURE PASS|GRADED A+
Project Delivery System - CORRECT ANSWERS How team members are organized,
establishes when parties engage, determines roles of parties, and determines sequence of design,
procurement, and construction (db, cmar, dbb)



Procurement Method - CORRECT ANSWERS how team members are selected (QBS, best
value, low price, sole source)



contracting approach - CORRECT ANSWERS how team members are paid (fp, gmp, cost
reimbursement, target price, unit price)



Design-Bid-Build (DBB) - CORRECT ANSWERS linear, sequential process, A/E selected on
qualifications, GC selected on low price, design is fully completed without input from GC, A/E acting in
owner's interests, with a historically strong bond, process is well-established and understood



construction manager at risk - CORRECT ANSWERS similar org structure to DBB, construction
manager selected by QBS or best value, contractor provides precon services, negotiated gmp
contracting approach, open book estimating process, potential to fast track project, construction cost
determined before design completed, potential issues over what is reasonably inferable from gmp
design documents



Design-Build - CORRECT ANSWERS The owner contracts with one entity (a person or firm) to
provide both design and construction services, designer and contractor have a direct contractual
relationship, selected by QBS or best value, wide spectrum of contracting approaches and organizational
structures, single point responsibility, owner does not manage designer, owner exposure to claims is
significantly reduced

, engineer procure construct (epc) - CORRECT ANSWERS similar to design build, in industrial
and power generation sectors, systems and performance testing are central to scope, contractor will
typically perform engineering with its in-house staff, owner has need for single point responsibility,
contracts include plant and process performance guarantees, contract items include performance and
schedule liquidated damages and limitations of liability



Multiple Prime Contracting - CORRECT ANSWERS owner contracts with multiple trade
contractors, attributes are typically similar to dbb, owner's ability to schedule and coordinate the work



Integrated Project Delivery (IPD) - CORRECT ANSWERS multi-party agreement - all parties
equal, QBS procurement and target pricing contract approach, private sector use (limited at this time),
key: owner's ability to accept risk



public-private partnership (p3) - CORRECT ANSWERS Instead of government building and
maintaining major infrastructure (such as highway, water treatment plant), build and maintenance is
outsourced to a private company. Opposed by public sector unions. this is not considered a delivery
system but its underlying approaches are delivery systems and typically use DB. multiple procurement
and contracting approaches



shift left - CORRECT ANSWERS intense efforts to establish scope early in the process; drives
early team formation to include key trade subcontractors; can enable big decisions to be made early,
affect project outcomes at lowest cost, establish a need for co-location and collaboration, and compress
time during concurrent design and construction



traditional design build - CORRECT ANSWERS typically two-phase best value procurement
with lump sum contract; owner defines project requirements and scope of prescriptive work; use of
performance-based technical requirements with limited prescriptive specifications



progressive design build - CORRECT ANSWERS design and price are progressively developed
after the design-builder is under contract; final project cost and schedule commitment is not established
as part of the selection process; two phases: preliminary services and final design and construction
services

Información del documento

Subido en
17 de febrero de 2026
Número de páginas
14
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$15.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Vendido
147
Seguidores
136
Artículos
5806
Última venta
8 meses hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes