◉ a. Increase the capacity of the constraining workstation . Answer: A
multi-step manufacturing process' capacity is limited by one if its
workstations. To increase the process' capacity, the factory must:
a. Increase the capacity of the constraining workstation
b. Increase production starts (work put into the first operation)
c. Decrease the utilization of all workstations in the process
d. Decrease the utilization of the constraining workstation
◉ b. Line Balancing . Answer: The optimal number of workers may be
determined by:
a. Standard cost data
b. Line balancing
c. Labor and Overhead
d. Industry standard
◉ d. Production workers . Answer: Production standards in a lean
system should be established by:
, a. Scheduling managers
b. process engineers
c. efficiency experts
d. Production workers
◉ b. root cause of the problem . Answer: The greatest contribution of the
5- why analytical tool is that it helps the lean practitioner to identify the:
a. solution to the problem
b. root cause of the problem
c. number of occurrences of the problem
d. person who caused the problem
◉ b. create a current state value stream map . Answer: To identify waste
in a selected production line, the first step is to:
a. Perform 5-S activities to organize the line
b. create a current state value stream map
c. determines the specific material that runs in the line
d. perform a time and motion study
◉ c. Changing the shape or character of a product or assembly . Answer:
Which of the following is considered value-added work?
a. Eliminating all defects and the need for rework
b. Empowering employees to establish their own work standards