TRIED AND TESTED| //GRADE+//
Which term describes the Six Sigma Methodology used for process
improvement?
A "Process Problem Improvement (PPI)"
B "Define, Measure, Analyze, Improve, Control (DMAIC)"
C Process Quality Management and Improvement (PQMI)"
D "Design for Six Sigma (DFSS)"
B "Define, Measure, Analyze, Improve, Control (DMAIC)"
The team member most responsible for removing roadblocks and
securing resources is the...
A "Master Black Belt."
B "Black Belt."
C "Green Belt."
D "Project Champion."
D "Project Champion"
Which term can be used to measure the capability of a process?
A "Defects per Million Opportunities (DPMO)"
B "Process Quality"
,C "Just in Time (JIT)
D "Design of Experiments (DOE)"
A "Defects per Million Opportunities (DPMO)"
Benefits from reducing variation in a process include improved process
capability, decreased costs, and which of the following?
A "A change of customer requirements"
B "Improvement of the company's culture"
C "A revised project charter"
D "Reduced Defects per Million Opportunities (DPMO)"
D "Reduced Defects per Million Opportunities (DPMO)"
Six Sigma has been described as a commitment to your customers, a
statistical measurement of processes and which of the following?
A "A faddish theoretical method of quality management"
B "A way to increase variation"
C "A method to speed up the process"
D "A management framework for thinking about process economics,
quality, and customers"
D "A management framework for thinking about process economics,
quality, and customers"
In which stage of the Six Sigma Methodology are the customer's
requirements identified?
,A "Improve"
B "Analyze"
C "Define"
D "Control"
C "Define"
Which of the following statements regarding Six Sigma is correct?
A "Applies only to manufacturing"
B "Works best in financial processes"
C "Reduces variation and eliminates defects"
D "Focuses only on statistical measurement"
C "Reduces variation and eliminates defects"
responsibilities for the improvement project will transition from the
Improvement Team to the Operations Team in which DMAIC phase?
A "Improve"
B "Analyze"
C "Control"
D "Define"
C "Control"
, For a process running at the six sigma level of quality, which one of the
following represents the equivalent Defects per Million Opportunities
(DPMO) value?
A "66,810"
B "10,000"
C "3.4"
D "6,000"
C "3.4"
99% quality represents which Sigma level of quality?
A "3.4"
B "3.8"
C "6"
D "99"
B "3.8"
A Kaizen Event...
A "is typically carried out over a period of a year or two."
B "is designed to produce rapid results."
C "implements improvements to the entire value stream at the same
time."