With this clear summary of chapters 1 to 4 of Project Management (8th edition) you are one step closer to passing your exam!

Institución
Grado

Vista previa del contenido

SV Project Management

Chapter 1: practical theory
Improvised activities =
Not according to a laid down plan + usually when something unforeseen occurs that requires an
immediate response.
 Hard to predict the outcomes
 Flexible, but often chaotic (ad hoc)

Routine activities =
Activities that are repeated frequently and are relatively predictable. Work will be carried out
according to patterns
 Production line activities, sales procedures

Project-based activities =
Between improvised and routine activities. Have a limited duration and are predictable.
 Work divided in phases
 First project plan
 Information technology

Project =
A group of people, usually from various fields of expertise, collaborating temporarily with the aim of
reaching a predetermined project result within a predetermined budget and timeframe.
 Constructing projects (building bridge/factory)
 Developing new product
 Introducing learning environment at schools
 Organizing a festival

Project features
 Temporary (clear starting point, finishing date)
 Unique and clearly defined goal
 Has a clearly defined result
 Project sponsor (paying the project)
 Project organization (project manager & team)
 Project members different expertise
 What is the result

Type of projects
1. Technical projects (or hard projects)
- Change in technology or develop new product
 Construction of a building, a road

2. Social projects (or soft projects)
- Change organizational structure or culture of company (how people work together)
 Reorganization

3. Commercial projects
- Goal is to earn money
 Conducting market research, new product

4. Mixed projects
- Both technical and social projects

, - Difficult because team has wide variety expertise
 Design, programming and installation of a computer program

Top project failure reasons
1. Poor planning
2. Too optimistic planning
3. Failure to track progress
4. Starting an activity too late
5. Project members are not competent enough
6. Little delays all add up

Phases of a small project:
1. Preparation (think)
2. Realization (act)
3. Follow-up (maintain)

Phases of a large project:
1. Concept  the idea, project proposal
2. Definition  define result, project plan
3. Design  decide result, design report
4. Preparation  detailing how, building plan
5. Realization  doing it, project result
6. Follow-up  provide follow-up, resolving problems
 In phases because then the client can adjust in the project

Project should be SMART
 Specific: project result described in detail
 Measurable: result must be measurable
 Acceptable: group/person must be responsible for achieving the result
 Realistic: result must be realistic
 Time-bound: deadline

Chapter 2: people working on projects
Marshmallow challenge:
- Teams of 4
- Forces people to collaborate quickly
- Normally first orienting (talk)
- Planning
- Building
- Ta-da
 The ‘Ta-da’ is a ‘oh-oh’: fail

None of the kids spend any time to talk.
- Business students are trained to find the plan
- When it happens, they run out of time.

They manage the process
- Any team who does that, improve the team performance

Why conduct the marshmallow challenge:
- It helps the hidden assumptions
- The challenge is the shared experience

Libro relacionado

Escuela, estudio y materia

Institución
Estudio
Grado

Información del documento

¿Un libro?
No
¿Qué capítulos están resumidos?
Hoofdstuk 1 t/m 4
Subido en
30 de marzo de 2021
Número de páginas
8
Escrito en
2020/2021
Tipo
RESUMEN

Temas

$10.06
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Reseñas de compradores verificados

Se muestran los comentarios
4 año hace

5.0

1 reseñas

5
1
4
0
3
0
2
0
1
0
Reseñas confiables sobre Stuvia

Todas las reseñas las realizan usuarios reales de Stuvia después de compras verificadas.

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
linastudeert NHL Stenden Hogeschool
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
137
Miembro desde
5 año
Número de seguidores
112
Documentos
1
Última venta
4 meses hace
Studeren met gemak!

Tijdens het studeren moet je het jezelf makkelijk maken. Door voor een leuk prijsje een samenvatting te kopen bespaar je zeeën van tijd. Dit zijn samenvattingen die duidelijk gestructureerd zijn wat het studeren makkelijker en sneller maakt. Met deze samenvattingen heb ik de tentamens behaald, nu jij nog! Succes!

3.9

24 reseñas

5
11
4
5
3
4
2
2
1
2

Documentos populares

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes