Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 6 páginas
Examen

CM 413 Jobsite Final Exam Questions With Complete Solutions

Document preview thumbnail
Vista previa 2 fuera de 6 páginas

CM 413 Jobsite Final Exam Questions With Complete Solutions

Vista previa del contenido

CM 413 Jobsite Final Exam Questions With Complete
Solutions

A "grandfather" clause is when owners and engineers attempt to
pass on the unexpected costs to the contractor. Correct Answers
True

A contractor for simple temporary structures has to submit
detailed plans, prepared or checked and signed by a licensed
professional engineer. Correct Answers True

A contractor's cost-keeping system should provide the contractor
with information for which of the following? Correct Answers
All of the above

A cost of labor and materials plus markup is the type of change
order that occurs when there is no agreement between the parties
as to how to best resolve the value of a completed change.
Correct Answers True

A temporary structure contractor may enter into a contract
directly with Correct Answers All of the above

All parties on a construction site have responsibility both to the
other contracting parties and to a wide range of third persons as
well. Correct Answers True

An arbitration award is legally binding on both sides and
enforceable in a court of law. Correct Answers True

, Aspects of temporary structures, such as design, allowable
stresses and loads, materials, and inspection, _______ the
permanent structure. Correct Answers are different from

Building codes and standards are largely silent on temporary
structures and the technical literature is scant on the subject.
Correct Answers True

Estimates for the cost of temporary structures entail a three step
process? Correct Answers True

Failure to comply with the federal code can subject the
contractor to substantial civil penalties by _____? Correct
Answers OSHA

For Academy at Chorro, when is substantial completion?
Correct Answers August 2018

For the Coast Hills project, how thick is the concrete slab under
the vault? Correct Answers 24"

For the Coast Hills project, what scheduling system does the
project use? Correct Answers P6

How expensive was the scaffolding system for the Coast Hills
project? Correct Answers 200k

How many housing units does the Academy at Chorro have?
Correct Answers 27 Units

Información del documento

Subido en
5 de febrero de 2026
Número de páginas
6
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$12.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Classroom
4.0
(1201)
Vendido
4936
Seguidores
3238
Artículos
55924
Última venta
21 horas hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes