SYSTEMS ANALYSIS AND DESIGN 11TH
EDITION KENNETH KENDALL JULIE
KENDALL TEST BANK ALL CHAPTERS
100% ORIGINAL VERIFIED A+ FINAL
STUDY GUIDE 2026 SOLVED QUESTIONS
FULLY CORRECT
⫸ Which of the following activities happens during the SDLC planning
phase? Answer: A presentation of why the system should or should not
be developed by the organization is given.
⫸ In which phase of the SDLC are the system requirements studied and
structured? Answer: Analysis
⫸ In which phase of the SDLC is the description of the recommended
solution converted into logical and then physical system specifications?
Answer: Design
⫸ In which phase of the SDLC is the information system coded, tested,
installed, and supported in the organization? Answer: Imlementation
⫸ In which phase of the SDLC is an information system systematically
repaired and improved? Answer: Maintenance
, ⫸ Which of the following are delivered after the completion of the
implementation phase? Answer: Code, documentation, training
procedures, and support capabilities
⫸ Which of the below is NOT a true statement regarding the SDLC?
Answer: It is a rapid method to prototype and develop an application.
⫸ Which of the following is a reason why a company may outsource
certain operations? Answer: Outsource noncore activities
⫸ ________ is the practice of turning over responsibility of some to all
of an organization's information systems applications and operations to
an outside firm. Answer: Outsourcing
⫸ Which of the following is NOT a major category of sources of
software? Answer: Offshore
⫸ Which of the following is a function of an IT service firm? Answer:
Run applications for customers
⫸ ________ solutions integrate individual traditional business functions
into a series of modules so that a single transaction occurs seamlessly
within a single information system rather than several separate systems.
Answer: ERP
EDITION KENNETH KENDALL JULIE
KENDALL TEST BANK ALL CHAPTERS
100% ORIGINAL VERIFIED A+ FINAL
STUDY GUIDE 2026 SOLVED QUESTIONS
FULLY CORRECT
⫸ Which of the following activities happens during the SDLC planning
phase? Answer: A presentation of why the system should or should not
be developed by the organization is given.
⫸ In which phase of the SDLC are the system requirements studied and
structured? Answer: Analysis
⫸ In which phase of the SDLC is the description of the recommended
solution converted into logical and then physical system specifications?
Answer: Design
⫸ In which phase of the SDLC is the information system coded, tested,
installed, and supported in the organization? Answer: Imlementation
⫸ In which phase of the SDLC is an information system systematically
repaired and improved? Answer: Maintenance
, ⫸ Which of the following are delivered after the completion of the
implementation phase? Answer: Code, documentation, training
procedures, and support capabilities
⫸ Which of the below is NOT a true statement regarding the SDLC?
Answer: It is a rapid method to prototype and develop an application.
⫸ Which of the following is a reason why a company may outsource
certain operations? Answer: Outsource noncore activities
⫸ ________ is the practice of turning over responsibility of some to all
of an organization's information systems applications and operations to
an outside firm. Answer: Outsourcing
⫸ Which of the following is NOT a major category of sources of
software? Answer: Offshore
⫸ Which of the following is a function of an IT service firm? Answer:
Run applications for customers
⫸ ________ solutions integrate individual traditional business functions
into a series of modules so that a single transaction occurs seamlessly
within a single information system rather than several separate systems.
Answer: ERP