Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 5 páginas
Examen

OPMA 3306 FINAL EXAM REVIEW QUESTIONS| PASS | GUARANTEED PASS

Document preview thumbnail
Vista previa 2 fuera de 5 páginas

OPMA 3306 FINAL EXAM REVIEW QUESTIONS| PASS | GUARANTEED PASS

Vista previa del contenido

OPMA 3306 FINAL EXAM REVIEW QUESTIONS| PASS |
GUARANTEED PASS


A BOM file is also called which of the following - Answers -Product Tree

MRP stands for Material Requirements Planning - Answers -True

A project can be subdivided into which of the following - Answers -work packages

MRP is most valuable where a number of products are made in batches using the same
productive equipment - Answers -True

PERT is an abbreviation for which of the following methodologies - Answers -Program
Evaluation and Review Technique

How many free trade zones are there in the US - Answers -about 260

A master production schedule is an input to a material requirements planning (MRP)
system - Answers -True

An input to the material requirements planning (MRP) system is an exception report -
Answers -False

Which of the following are eligible companies to be considered for the Baldrige award -
Answers -auditing firms

An input to the material requirements planning (MRP) system is an inventory records file
- Answers -True

MRP systems seek to achieve - Answers -determine the number of dependent demand
items needed

A modular bill of materials includes items with fractional options - Answers -False

An analytical tool used in six-sigma quality improvement programs is which of the
following - Answers -checksheets

In monitoring process quality we might use which of the following statistics - Answers -
difference between the highest and lowest value in a sample

Quality of life in a host community is not a major factor in making the facility location
decision - Answers -False

, AQL stands for accepting questionable lots in production quality management -
Answers -False

Net change MRP systems are "activity" driven - Answers -True

A BOM file is also called - Answers -Product Tree

Which of the following should we use an "R" chart to monitor process quality - Answers
-tire pressures in an auto assembly plant

In a net change MRP system requirements and schedules are considered rigid and
never updated - Answers -False

What is a work breakdown structure - Answers -A definition of the hierarchy of project
tasks, subtasks, and work packages

Low level coding in MRP indicates that exact status of each item managed by the
system in "real time" - Answers -False

For which of the following should we use a "p" chart to monitor process quality -
Answers -Defective electrical switches

Breakthrough projects are those that provide fundamental improvements to existing
products - Answers -False

A lot for lot (L4L) lost sizing technique does not take into account setup costs or
capacity limitations - Answers -True

"Projected available balance" is a term referring to unsold finished goods inventory -
Answers -False

When implemented correctly, MRP links all areas of the business. - Answers -False

Which of the following is not a production activity report generated by MRP - Answers -
Bill of Materials report

Time fences are periods of time having some specified level of opportunity for the
customer to make changes. - Answers -True

TQM is an acronym meaning "total quality measurement." - Answers -False

One SPC tool used in total quality management is the Pareto chart. - Answers -True

An operational goal of total quality management is the careful design of the product or
service - Answers -True

Información del documento

Subido en
30 de enero de 2026
Número de páginas
5
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$12.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
GEEKA
3.8
(360)
Vendido
2133
Seguidores
1447
Artículos
58229
Última venta
1 semana hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes