100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

PROJECT MANAGEMENT EXAMPREP 2026 TEST BANK COMPLETE VERIFIED SOLUTION SET

Puntuación
-
Vendido
-
Páginas
26
Grado
A+
Subido en
30-01-2026
Escrito en
2025/2026

PROJECT MANAGEMENT EXAMPREP 2026 TEST BANK COMPLETE VERIFIED SOLUTION SET

Institución
PROJECT MANAGEMENT
Grado
PROJECT MANAGEMENT










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
PROJECT MANAGEMENT
Grado
PROJECT MANAGEMENT

Información del documento

Subido en
30 de enero de 2026
Número de páginas
26
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

PROJECT MANAGEMENT EXAMPREP 2026
TEST BANK COMPLETE VERIFIED
SOLUTION SET

⩥ Mila managed a project to develop a website for a restaurant.Which
description below is an assumption, as opposed to a requirement?


a. The restaurant owner thought customers would prefer using a website
over a mobile app.
b. The restaurant owner wants customers to make reservations via
telephone.
c. The restaurant owner wants a professional photographer to take
pictures of his signature dishes.
d. The restaurant owner needs the head chef to include a professional
bio. Answer: a. The restaurant owner thought customers would prefer
using a website over a mobile app.


⩥ If the project sponsor never gives the project manager authority to
make decisions and the project fails, which reason for failure below does
this illustrate?
a. Problems with communications
b. Problems with project deliverables
c. Problems with unforeseeable circumstances

,d. Problems with the project process. Answer: d. Problems with the
project process


⩥ Which of the following is true regarding project methodologies?
a. The phase-based methodology allows for frequent adaptations.
b. The phase-based project methodology goes through phases
sequentially.
c. The iterative methodology involves a more traditional approach.
d. The iterative methodology works better with an easily defined
project.. Answer: b. The phase-based project methodology goes through
phases sequentially.


⩥ Which of the following pairs of items occur during Phase 1 of the
project life cycle?
a. Finalizes the costs for completing project deliverables; estimates
resources needed for the project
b. Estimates resources needed for the project; works with stakeholders to
define purpose of project
c. Works with stakeholders to define purpose of project; assigns work to
team members
d. Assigns work to team members; finalizes the costs for completing
project deliverables. Answer: b. Estimates resources needed for the
project; works with stakeholders to define purpose of project

, ⩥ Elizabeth is planning a high school reunion at the city park. When
researching the weather, she found that there was a 15% chance that it
would rain on the selected weekend. However, if it did rain, it would be
a disaster -- they would have to rent a tent to cover the seating area, they
wouldn't have any indoor space for the caterer, and their DJ wouldn't be
able to perform. Which of the following lists the corresponding degree
of probability and the level of impact that a rainy weekend would have?
a. High probability and medium negative impact
b. High probability and high negative impact
c. Low probability and high negative impact
d. Medium probability and medium negative impact. Answer: c. Low
probability and high negative impact


⩥ What is the first step a project manager performs after officially
beginning a project?
a. Assign tasks to the project team members
b. Create a project plan
c. Communicate the rules of project governance
d. Create a scope document. Answer: d. Create a scope document


⩥ Which of the following is an example of a process project?
a. Develop a new school club
b. Instruct students on the dress code policy
c. Change the methods for hiring teachers
$11.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
ProfessorEddieJessup

Conoce al vendedor

Seller avatar
ProfessorEddieJessup Havard School
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
Nuevo en Stuvia
Miembro desde
2 meses
Número de seguidores
1
Documentos
1670
Última venta
-

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Documentos populares

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes