100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

Project Management in Practice – 7th Edition Test Bank | Meredith | Comprehensive Exam Preparation Resource

Puntuación
-
Vendido
-
Páginas
146
Grado
A+
Subido en
29-01-2026
Escrito en
2025/2026

This document provides a complete test bank for Project Management in Practice, 7th Edition by Meredith, covering key project management concepts, tools, and real-world applications. It is designed to help students prepare for exams by practicing scenario-based and conceptual questions aligned with the textbook content.

Mostrar más Leer menos
Institución
Project Management In Practice
Grado
Project Management in Practice











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Libro relacionado

Escuela, estudio y materia

Institución
Project Management in Practice
Grado
Project Management in Practice

Información del documento

Subido en
29 de enero de 2026
Número de páginas
146
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Test Bank For
Project Management in Practice, 7th Edition Meredith

Chapter 1-8

Chapter 1: The World of Project Management

True/False

1. A primary purpose of forming projects is to assign the responsibility for
accomplishing some organizational task to a specific person or small group.

Answer: True
Response: See section 1.1
Level: easy



2. One of the few similarities between project management and general management
is that both exist in the well-defined organizational structure of
superior/subordinates in the overall organization.

Answer: False
Response: See section 1.2
Level: medium



3. Many recent developments in project management are being driven by changes in
the nature of the American workforce.

Answer: False
Response: See section 1.1
Level: medium




4. There has been a growing use of projects to achieve an organization’s strategic
goals

Answer: True
Response: See section 1.1

Copyright ©2017 John Wiley & Sons, Inc.

, Level: medium



5. While general managers have their authority limited to specific areas in the
overall organization, project managers have authority over any activity required
by the project.

Answer: False
Response: See section 1.2
Level: medium



6. Projects are always carried out under conditions of uncertainty.

Answer: True
Response: See section 1.3
Level: easy




7. One can trade-off time and cost when managing a project, but the project’s
technical specifications must be maintained exactly as the client initially
specifies.

Answer: False
Response: See section 1.3
Level: medium



8. Nonnumeric project selection methods are only suitable if numeric methods are
not available.

Answer: False
Response: See section 1.5
Level: medium




Copyright ©2017 John Wiley & Sons, Inc.

,9. When using financial methods for selecting projects, the payback period is the
simplest and best method to use.

Answer: False
Response: See section 1.5
Level: medium



10 Rank-ordering a large number of projects can be done with a Q-sort.

Answer: True
Response: See section 1.5
Level: medium



11. A disadvantage of using the payback period method for selecting projects is that it
cannot reflect the time-value of money.

Answer: True
Response: See section 1.5
Level: medium




12. A disadvantage of using the discounted cash flow method (or net present value)
for selecting projects is that it ignores all non-monetary factors associated with
the project except risk.

Answer: True
Response: See section 1.5
Level: medium



13. A disadvantage of using scoring models rather than financial models for selecting
projects is that they cannot include the project’s profitability.

Answer: False




Copyright ©2017 John Wiley & Sons, Inc.

, Response: See section 1.5
Level: medium



14. A PM does not need to understand why a project is selected for funding because
he did not initiate the process.

Answer: False
Response: See section 1.5
Level: medium



15. The main distinction between platform and breakthrough projects is that the
former usually depend on existing technology.

Answer: True
Response: See section 1.6
Level: medium



16. The main distinction between platform and derivative projects is that the latter
depend on existing technology.

Answer: False
Response: See section 1.6
Level: medium




17. One reason for the emphasis on project management is that tasks fit neatly into
business-as-usual.

Answer: False
Response: See section 1.1
Level: easy




Copyright ©2017 John Wiley & Sons, Inc.
$16.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
itsjustel

Conoce al vendedor

Seller avatar
itsjustel Teach me 2
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
Nuevo en Stuvia
Miembro desde
2 semanas
Número de seguidores
0
Documentos
23
Última venta
-
Trusted Nursing Resources for top marks

itsjustell – Test Banks & Practice Exams (Graded A+) Welcome to itsjustell, your trusted source for reliable and comprehensive nursing exam resources. We understand that nursing school can be intense and challenging, but with the right study tools, success is achievable. That’s why we provide expertly prepared test banks and study guides designed to help you understand key concepts, build confidence, and perform your best in exams. At itsjustell, our goal is to support your nursing journey with study materials that truly make a difference — turning stress into success. Don’t stress. Just do your best, and everything is going to be alright. Good luck!

Lee mas Leer menos
0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes