If there is a disagreement whether the contractors work complies with the
contract:......ANSWER.......The government makes the final determination
Characteristics that describe a definable feature of work
include:......ANSWER.......Cross-referenced listings to the contractors
construction schedule that may have more than one definable feature under
a section of the specifications.
The _____________________ consists of daily checks of the work to assure
continuing compliance with contract requirements.......ANSWER.......Follow-
up phase
The Quality Assurance Plan:......ANSWER.......Is a government management
tool establishing staffing, training, pre-award activities, and surveillance
activities.
,2|Page
Testing is extremely important in construction quality management and is
performed by:......ANSWER.......Both the contractor and the government
If the contractor does not provide an adequate superintendent, the contract
allows the contracting officer to:......ANSWER.......Require the contractor to
assume personal supervision of the work.
The Quality Control Plan:......ANSWER.......Is the foundation upon which
quality work is based and outlines planned quality control procedures.
Tests that are unannounced, randomly performed, and repeat quality control
tests are:......ANSWER.......Quality Assurance tests
If initial review of the quality control plan shows it to be
unacceptable:......ANSWER.......The contractor makes changes before
acceptance.
The contractor quality control organization:......ANSWER.......May vary in
size depending on the work being performed at a point in time.
The Quality Control Plan contains:......ANSWER.......Identification of
individual quality quality control personnel, including name, qualifications,
assigned duties, responsibilities and authorities.
The preconstruction conference and the coordination and mutual
understanding meeting (Navy) are:......ANSWER.......Conducted prior to the
commencement of any physical construction work.
,3|Page
A cumulative list of job deficiencies/rework items can be found
in:......ANSWER.......A deficiency tracking system/reworks items list.
What is a purpose of the coordination and mutual understanding and
meeting (Navy)?......ANSWER.......To review the QC Plan with the contractor.
Which of the following is included in all three phases of the Three Phases of
Control.......ANSWER.......Safety.
Submittals are:......ANSWER.......Necessary to demonstrate that the proposed
materials, etc. are in compliance with the contract.
All submittals for government approval must be provided by the
_________________ in time to allow for the review, approval, procurement,
delivery, and performance of preparatory phase for an item before it is
needed for construction.......ANSWER.......Contractor to the Government
The means for enforcing contract compliance are provided in
the:......ANSWER.......Contract clauses of the contract.
ENG Form 4288-R, the submittal register:......ANSWER.......Identifies those
submittals requiring government approval
The primary purpose of the Three-Phase control system is
to:......ANSWER.......Require the contractor to plan and schedule his work.
, 4|Page
The contractor is required to conduct a preparatory phase meeting before he
begins any definable feature of work except when:......ANSWER.......There are
no exceptions to the rule.
The ____________________ is the appropriate time to assure that all
materials and/or equipment have been tested, submitted, and
approved.......ANSWER.......Preparatory phase
The ____________________ is workmanship oriented, and where
workmanship standards are established.......ANSWER.......Initial phase
The contract requires the contractor to submit quality control
reports:......ANSWER.......Daily.
The Quality Control report should address:......ANSWER.......Both work
completed and control activities
The Quality Assurance Report is the governments record of project-related
events and is prepared _______________.......ANSWER.......For each visit day
Grounds for withholding payment include the contractors failure
to:......ANSWER.......Perform in accordance with the terms of the contract,
provide a Quality Control Plan giving assurance of intent and ability to
comply with quality standards, and build to the quality standards established
by the contract.