100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

Solution Manual For Structural Analysis IN SI Unit 8th Edition by Russell C. Hibbeler, Tan Kiang Hwee| UPDATED VERSION 2026 A+

Puntuación
-
Vendido
-
Páginas
552
Grado
A+
Subido en
26-01-2026
Escrito en
2025/2026

Solution Manual For Structural Analysis IN SI Unit 8th Edition by Russell C. Hibbeler, Tan Kiang Hwee

Institución
Grado











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Libro relacionado

Escuela, estudio y materia

Grado

Información del documento

Subido en
26 de enero de 2026
Número de páginas
552
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

© 2012 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher.



1–1. The floor of a heavy storage warehouse building is
made of 6-in.-thick stone concrete. If the floor is a slab
having a length of 15 ft and width of 10 ft, determine the
resultant force caused by the dead load and the live load.

From Table 1–3

DL = [12 lb兾ft2 # in.(6 in.)] (15 ft)(10 ft) = 10,800 lb

From Table 1–4

LL = (250 lb兾ft2)(15 ft)(10 ft) = 37,500 lb
Total Load

F = 48,300 lb = 48.3 k Ans.




1–2. The floor of the office building is made of 4-in.-thick
lightweight concrete. If the office floor is a slab having a
length of 20 ft and width of 15 ft, determine the resultant
force caused by the dead load and the live load.

From Table 1–3

DL = [8 lb兾ft2 # in. (4 in.)] (20 ft)(15 ft) = 9600 lb

From Table 1–4

LL = (50 lb兾ft2)(20 ft)(15 ft) = 15,000 lb
Total Load

F = 24,600 lb = 24.6 k Ans.




1–3. The T-beam is made from concrete having a specific 40 in.
weight of 150 lb兾ft3. Determine the dead load per foot length
of beam. Neglect the weight of the steel reinforcement.
8 in.


1 ft2
w = (150 lb兾ft3) [(40 in.)(8 in.) + (18 in.) (10 in.)] a b 26 in.
144 in2
w = 521 lb兾ft Ans.


10 in.




1

,© 2012 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher.



*1–4. The “New Jersey” barrier is commonly used during
highway construction. Determine its weight per foot of
length if it is made from plain stone concrete. 4 in.



Cross-sectional area = 6(24) + a b (24 + 7.1950)(12) + a b (4 + 7.1950)(5.9620)
1 1
2 2 75°

12 in. 55°
= 364.54 in2
6 in.
Use Table 1–2.
1 ft2
w = 144 lb兾ft3 (364.54 in2) a b = 365 lb兾ft
24 in.
Ans.
144 in2




1–5. The floor of a light storage warehouse is made of
150-mm-thick lightweight plain concrete. If the floor is a
slab having a length of 7 m and width of 3 m, determine the
resultant force caused by the dead load and the live load.


From Table 1–3

DL = [0.015 kN兾m2 # mm (150 mm)] (7 m) (3 m) = 47.25 kN

From Table 1–4

LL = (6.00 kN兾m2) (7 m) (3 m) = 126 kN
Total Load

F = 126 kN + 47.25 kN = 173 kN Ans.




2

,© 2012 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher.



1–6. The prestressed concrete girder is made from plain
stone concrete and four 34 -in. cold form steel reinforcing
rods. Determine the dead weight of the girder per foot of its 8 in.
length.
6 in.

3 2
Area of concrete = 48(6) + 4 c (14 + 8)(4) d - 4(␲) a b = 462.23 in2
1
20 in.
2 8
3 2
Area of steel = 4(␲) a b = 1.767 in2 6 in.
8
8 in.
From Table 1–2,
1 ft2 1 ft2
w = (144 lb兾ft3)(462.23 in2) a 2
b + 492 lb兾ft3(1.767 in2) a b 4 in. 6 in.
144 in 144 in2 4 in.
= 468 lb兾ft Ans.




1–7. The wall is 2.5 m high and consists of 51 mm ⫻ 102 mm
studs plastered on one side. On the other side is 13 mm
fiberboard, and 102 mm clay brick. Determine the average
load in kN兾m of length of wall that the wall exerts on the floor.
2.5 m


Use Table 1–3.

For studs

Weight = 0.57 kN兾m2 (2.5 m) = 1.425 kN兾m

For fiberboard

Weight = 0.04 kN兾m2 (2.5 m) = 0.1 kN兾m

For clay brick

Weight = 1.87 kN兾m2 (2.5 m) = 4.675 kN兾m
Total weight = 6.20 kN兾m Ans.




3

, © 2012 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher.



*1–8. A building wall consists of exterior stud walls with
brick veneer and 13 mm fiberboard on one side. If the wall
is 4 m high, determine the load in kN兾m that it exerts on the
floor.


For stud wall with brick veneer.

w = (2.30 kN兾m2)(4 m) = 9.20 kN兾m
For Fiber board

w = (0.04 kN兾m2)(4 m) = 0.16 kN兾m

Total weight = 9.2 + 0.16 = 9.36 kN兾m Ans.




1–9. The interior wall of a building is made from 2 ⫻ 4
wood studs, plastered on two sides. If the wall is 12 ft high,
determine the load in lb兾ft of length of wall that it exerts on
the floor.


From Table 1–3

w = (20 lb兾ft2)(12 ft) = 240 lb兾ft Ans.




1–10. The second floor of a light manufacturing building is 4 in. cinder fill
constructed from a 5-in.-thick stone concrete slab with an 5 in. concrete slab
added 4-in. cinder concrete fill as shown. If the suspended
ceiling of the first floor consists of metal lath and gypsum
plaster, determine the dead load for design in pounds per
square foot of floor area.
ceiling

From Table 1–3,
5-in. concrete slab = (12)(5) = 60.0

4-in. cinder fill = (9)(4) = 36.0

metal lath & plaster = 10.0

Total dead load = 106.0 lb兾ft2 Ans.




4
$12.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TestsBanks University of Greenwich (London)
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
938
Miembro desde
4 año
Número de seguidores
184
Documentos
2495
Última venta
5 horas hace
Accounting, Finance, Statistics, Computer Science, Nursing, Chemistry, Biology & More — A+ Test Banks, Study Guides & Solutions

Welcome to TestsBanks! Best Educational Resources for Student I offer test banks, study guides, and solution manuals for all subjects — including specialized test banks and solution manuals for business books. My materials have already supported countless students in achieving higher grades, and I want them to be the guide that makes your academic journey easier too. I’m passionate, approachable, and always focused on quality — because I believe every student deserves the chance to excel. THANKS ALOT!!

Lee mas Leer menos
4.0

149 reseñas

5
84
4
23
3
15
2
7
1
20

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes