100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

OREGONCONSTRUCTIONCONTRACTORS CCB2026EXAMSCRIPTPRACTICETESTWITH PRACTICE QUESTIONSOLUTIONS

Puntuación
-
Vendido
-
Páginas
60
Grado
A+
Subido en
25-01-2026
Escrito en
2025/2026

OREGONCONSTRUCTIONCONTRACTORS CCB2026EXAMSCRIPTPRACTICETESTWITH PRACTICE QUESTIONSOLUTIONS

Institución
OREGON
Grado
OREGON











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
OREGON
Grado
OREGON

Información del documento

Subido en
25 de enero de 2026
Número de páginas
60
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

OREGON CONSTRUCTION
CONTRACTORS CCB 2026
EXAM SCRIPT PRACTICE TEST
WITH PRACTICE QUESTION
SOLUTIONS
◉ The state unemployment tax rate varies base on: Answer:
The history of unemployment claims against the employer.

◉ Stop work order violations can result in: Answer: - Any of
these could be the result of failure to comply with a stop work
order.
- Court action
- Permit or license revocation
- Civil penalties

◉ "Job Logic" refers to: Answer: The sequence of work

◉ True or False
Self-employment taxes apply to all forms of business entities.
Answer: False

◉ - Money earned and money spent are accounted for in the
year they are received or paid, respectively. Answer: In the Cash
Method

◉ The Itemized Summary is the basis for: Answer: A complete
and accurate estimate of project costs and lists all major items of
work in the order they are to be performed.

◉ A major difference between the EIN and the BIN is: Answer:
One is federal and one is state

,◉ Poor construction and storage practices can result in
_________________ inside the structure walls. Answer: Molds
and fungus

◉ Builders now must use corrosion-resistance flashing in these
specified locations, except: Answer: Surrounding all interior
bedroom doors.

◉ Compliance with environmental regulations can protect a
contractor from:

- All of these are correct
- Private party lawsuits
- Criminal and civil penalties
- Liability claims Answer: - All of these are correct
- Private party lawsuits
- Criminal and civil penalties
- Liability claims

◉ Using the Quantity Take-Off method for estimating, you
begin by estimating the cost of _________________ for each
individual task. Answer: Labor and materials

◉ Contractors must apply for permits through: Answer: Their
local building department

◉ A cost effective method for managing material costs and
keeping inventory costs down is the: Answer: JIT - Just In Time

◉ These are materials prohibited form open burning in Oregon
except for: Answer: Unpainted and untreated scrap wood

◉ An owner-seller may comply with the Homebuyers
Protection Act (HPA) by:

- Doing any of these

,- Purchasing title insurance that does not exclude filed or unfiled
claims of lien,
- Obtaining lien waivers or releases
- Retaining at least 25% of the sales price in escrow Answer: -
Doing any of these
- Purchasing title insurance that does not exclude filed or unfiled
claims of lien,
- Obtaining lien waivers or releases
- Retaining at least 25% of the sales price in escrow

◉ What are the possible consequences that a contractor may
face if he or she fails to provide the information to the Owner
About Construction Liens when required?

- All of these are correct
- Contractor may be fined
- Contractor may lose lien rights
- Contractor may have CCB license suspended Answer: - All of
these are correct
- Contractor may be fined
- Contractor may lose lien rights
- Contractor may have CCB license suspended

◉ Withheld taxes are considered to be "_____________" funds
that do not belong to the business and cannot be used for any
other purpose. Answer: Trust

◉ The major purpose of the building exterior shell is to:
Answer: Provide protection for the building at its exterior
boundaries and to enclose a suitable interior environment

◉ A project manager can be involved in more than one
construction project at the same time. Answer: True

◉ The building exterior shell may consist of:

- All of these are part of the building exterior shell

, - Only windows and doors
- Only exterior wall assemblies
- Only roof assemblies Answer: - All of these are part of the
building exterior shell
- Only windows and doors
- Only exterior wall assemblies
- Only roof assemblies

◉ Who is responsible for preparing the SDS? Answer: The
chemical manufacturer

◉ Project includes everything but: Answer: Annual office staff
salaries

◉ True or False
"White goods" include water heater, refrigerator, kitchen stoves,
dishwashers, washing machines, and clothes dryers. Answer:
True

◉ Under the completed contract method (CCM), these are
deferred until the project is complete except:

- All of these are deferred until completion
- Profits of losses
- Revenue
- Costs Answer: - All of these are deferred until completion
- Profits of losses
- Revenue
- Costs

◉ _______________ is not part of the Project Closeout process
Answer: Posting formal notice of the site safety rules.

◉ The income statement, cash flow statement, and balance
sheet are your business's "______________" Answer: Report
cards
$12.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
FocusFile7 Harvard University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
35
Miembro desde
7 meses
Número de seguidores
2
Documentos
21560
Última venta
1 día hace
FocusFile7

Welcome to FocusFile, your inspiring hub for academic excellence! Just like your favorite café where every sip brings comfort, FocusFile is designed to be your go-to space for clear thinking, deep focus, and study success. Here at FocusFile, I believe learning isn’t just about cramming it’s about clarity, growth, and building the confidence to conquer any challenge. That’s why you’ll find a handpicked collection of top-notch, easy-to-digest study materials, smart summaries, and guides tailored to a wide range of subjects and learning styles. Whether you're gearing up for exams, brushing up on class notes, or just need that extra push, FocusFile has you covered. From quick-reference sheets to deep-dive notes, there’s something here for every learner whether you're a visual thinker, a bullet-point lover, or someone who thrives on quick, impactful insights. Think of FocusFile as your academic sanctuary, a place where productivity meets peace of mind. So grab your favorite drink, settle in, and let’s sharpen your focus and fuel your success, one file at a time. Thanks for making FocusFile your study partner. Let’s unlock your full potential together!

Lee mas Leer menos
4.3

4 reseñas

5
2
4
1
3
1
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes