1. DOD relies on a combination of these three entities for the development of S&T to incorporate
-3 legged stool - (answer)Industry, DoD, org and universities
1. This center uses a broad charter for the purpose of performing, analyzing - (answer)FFRDC
1. CAIV also known as affordability, is about using cost to make these tradeoffs to keep weapon
systems affordable - (answer)Performance trade-offs
The AC strategy is based on information from the __ such as functional areas, range of military -
(answer)ICD
The procurement cost combines these two costs - (answer)Weapons and flyaway costs
The adaptive AC frameworks and six pathways are managed by - (answer)DoD 5000 series
, The purpose of this phase is to develop, build and test a system to verify that all operation and
implied requirements are met - (answer)EMD phase
Scrub budget year to prepare the defensible and detailed BES which culminates with the the
issuance of a resource management decision - (answer)Budgeting
This metrics is one of the statutory milestone decision information for a major capability
acquisition program - (answer)Risk
The MDA of the program has been briefed that a new capability which has a CDD-V with a
technical readiness level assessment of 6 - (answer)Milestone B
Components develop a POM IAW with the DPG, turns the DPG into achievable & FYDP -
(answer)Programming
These appropriation categories are needed for a product improvement programs (PIP) which
increase performance system - (answer)RDT&E, procurement, O&M
___allows program to make predictions about futures - (answer)Escalation and budgeting