100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

CNST 210 Exam Questions and Answers (Latest Update 2026).docx

Puntuación
-
Vendido
-
Páginas
45
Grado
A+
Subido en
23-01-2026
Escrito en
2025/2026

CNST 210 Exam Questions and Answers (Latest Update 2026).docx

Institución
CNST
Grado
CNST











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
CNST
Grado
CNST

Información del documento

Subido en
23 de enero de 2026
Número de páginas
45
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

CNST 210 Exam Questions and Answers
(Latest Update 2026)
The steel fabricator -
All of the above.


These tapered steel tools are used by ironworkers to align and hold
steel pieces together during the steel erection process. -
correct answer ✅Drift pins


Methods of fireproofing steel columns include all of the following
except -
correct answer ✅encasement in OSB or MDF.


Bolt holes in steel members can only be drilled per the AISC code.
They can not be punched. -
correct answer ✅False


What are the two primary methods for connecting structural steel
today? -
correct answer ✅Bolting and Welding


The three main ASTM Bolt types are? -
correct answer ✅A307, A325, A490

,CNST 210 Exam Questions and Answers
(Latest Update 2026)
The two basic bolted joint types are? -
correct answer ✅Bearing and Slip-critical


These are all ways to tighten a slip-critical connection except -
correct answer ✅Knuckle tight


The most commonly made type of weld is? -
correct answer ✅Fillet


Welding positions include all of the following except? -
correct answer ✅Sideways


The name of the construction workers trained in the erection of
steel is -
correct answer ✅Ironworkers


The weight of one 30 ft long W16 x 26 section is -
correct answer ✅780 lbs


You have to transport a load of W16 x 26 wide flange sections from
your fabrication shop to the construction jobsite. The length of the
sections is 30'. The maximum allowable load on the tridem axle

,CNST 210 Exam Questions and Answers
(Latest Update 2026)
flatbed trailer that will be used to haul the steel is 42,500 lbs. How
many W16 x 26 sections can you fit on the trailer? -
correct answer ✅54


You have to transport a load of L6 x 6 x ½ angle sections from your
fabrication shop to the construction jobsite. The length of sections
is 20'. The maximum allowable load on the tridem axle flatbed
trailer that will be used to haul the steel is 42,500 lbs. How many L6
x 6 x ½ angle sections can you fit on the trailer? -
correct answer ✅108


Go to https://www.aisc.org/steel-solutions-center/. Click the blue
box that says "View Technical Solutions" and then under
"Frequently Asked Questions" select "6. Bolting" to find the answer
to the following question: Information that must be included in the
purchase order for high-strength bolts includes all of the following
except -
correct answer ✅For projects requiring slip-critical connections,
that the lubricated bolt, nut and washer be pre-assembled to
ensure proper fit of the bolt and nut and that the lot be tested for
strength prior to shipment to the purchaser to meet the
requirements of the 2004 RCSC Specification Table 4.

, CNST 210 Exam Questions and Answers
(Latest Update 2026)
Go to https://www.aisc.org/steel-solutions-center/. Click the blue
box that says "View Technical Solutions" and then "Frequently
Asked Questions". Answer the following question:
What minimum stick-through is required for high-strength bolts?
(hint: See "other general information") -
correct answer ✅None


A British UB 305 x 165 x 40 (Universal Beam) has a unit mass of 40.3
kg/m. How many 9 meter long UB 305 x 165 x 40 sections can you
fit on a flat bed trailer that has a capacity of 20,000 kg? -
correct answer ✅55


Bolts and nuts should be cleaned of all grease, wax or other
lubricant prior to installation (if you are not sure, Ask AISC). -
correct answer ✅False


AISC recommends that owners ensure that their steel fabricators
use this certification program. -
correct answer ✅AISC Quality Certification Program


A tack weld is -
correct answer ✅a temporary weld used to hold parts in place
while more extensive, final welds are made
$15.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Chloelunar University Of Nevada-Las Vegas
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
68
Miembro desde
1 año
Número de seguidores
7
Documentos
11136
Última venta
3 días hace

Get study materials, exam answer packs, step-by-step assignment solutions, and much more. Learn more effectively and quickly. After acquiring any document, please always provide a review to ensure that our consumers are completely satisfied.Best Wishes!!!!!!

3.6

13 reseñas

5
5
4
4
3
1
2
0
1
3

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes