100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

CNST 379 - FINAL EXAM (BARROWS)QUESTIONS AND ANSWERS.docx

Puntuación
-
Vendido
-
Páginas
42
Grado
A+
Subido en
23-01-2026
Escrito en
2025/2026

CNST 379 - FINAL EXAM (BARROWS)QUESTIONS AND ANSWERS.docx

Institución
CNST
Grado
CNST











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
CNST
Grado
CNST

Información del documento

Subido en
23 de enero de 2026
Número de páginas
42
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

CNST 379 - FINAL EXAM
(BARROWS)QUESTIONS AND ANSWERS
(T/F) If owner is looking to achieve an iconic design for their project,
using the design/build project delivery method is their best option -
correct answer ✅False


(T/F) A general contractor that utilizes a design-bid-build project
delivery method typically accepts more risk then a contractor that
utilizes a design-build project delivery method -
correct answer ✅False


(T/F) When an owner is using the construction manager not at risk
project delivery method the general contractor won't typically get
involved until after the pre construction process is complete -
correct answer ✅False


(T/F) Once an owner awards a project to a general contractor, the
contractor is guaranteed to make the original amount of profit they
determined on bid day -
correct answer ✅False


(T/F) An addendum is a change to the bidding documents that
occurs after the owner enters into a contract with the general
contractor -
correct answer ✅False

,CNST 379 - FINAL EXAM
(BARROWS)QUESTIONS AND ANSWERS

(T/F) An RFQ is a document issued by a buyer of services to sellers
of services, requesting documentation of their general
qualifications an experience, to determine whether such sellers are
qualified to provide the services required by the buyer -
correct answer ✅True


(T/F) A verbal response from the architect or owner to a request for
information from a contractor during a pre bid site visit is legally
binding -
correct answer ✅False


(T/F) The GMP contract type is most often used with the design-bid-
build project delivery method -
correct answer ✅False


GMP is a term used when discussing contract types. GMP stands for
-
correct answer ✅Guaranteed Maximum Price


The project delivery method in which the major members of a
project team enter into a multiparty agreement, place their profit

,CNST 379 - FINAL EXAM
(BARROWS)QUESTIONS AND ANSWERS
into a risk pool, and share equally in the risks and rewards of the
project is called -
correct answer ✅IPD


What is the name of a spreadsheet used to compile all the costs of
the bid for a construction project? (Including general conditions,
direct costs, indirect costs, fee, OH, insurance, etc) -
correct answer ✅Bid Tab


The project delivery method used most often for smaller, horizontal
construction projects is -
correct answer ✅dbb


the project delivery method used most for vertical construction
projects is -
correct answer ✅dbb


The most detailed and lowest level of a work breakdown structure
is broken down into separate -
correct answer ✅work packages

, CNST 379 - FINAL EXAM
(BARROWS)QUESTIONS AND ANSWERS
CD, DD, and SD are acronyms that describes the level of design of a
set of project documents. Which phase shows the most amount of
information? -
correct answer ✅CD


CD stands for -
correct answer ✅Construction Documents


DD stands for -
correct answer ✅Design documents


SD stands for -
correct answer ✅Schematic design


A construction contract type where are the quantities are provided
by the owner/engineer and the contractor only has to assign cost is
a ____________ contract type -
correct answer ✅Unit price


IPD is a project delivery method. IPD stands for -
correct answer ✅Integrated project delivery
$15.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Chloelunar University Of Nevada-Las Vegas
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
68
Miembro desde
1 año
Número de seguidores
7
Documentos
11041
Última venta
3 días hace

Get study materials, exam answer packs, step-by-step assignment solutions, and much more. Learn more effectively and quickly. After acquiring any document, please always provide a review to ensure that our consumers are completely satisfied.Best Wishes!!!!!!

3.6

13 reseñas

5
5
4
4
3
1
2
0
1
3

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes