Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 4 fuera de 80 páginas
Examen

MICHIGAN BUILDER’S LICENSE EXAM|QUESTIONS AND 100% CORRECT WELL DETAILED ANSWERS|LATEST UPDATE!!!!2025/2026|GUARANTEED PASS|GRADED A+|VERIFIED

Document preview thumbnail
Vista previa 4 fuera de 80 páginas

MICHIGAN BUILDER’S LICENSE EXAM|QUESTIONS AND 100% CORRECT WELL DETAILED ANSWERS|LATEST UPDATE!!!!2025/2026|GUARANTEED PASS|GRADED A+|VERIFIED

Vista previa del contenido

ANSWERS|LATEST
UPDATE!!!!2025/2026|GUARANTEED PASS|GRADED



IRC (International Residential Code) - ANSWER Created to serve as a complete,
comprehensive code regulating the construction of single-family, two-family and buildings
consisting of three or more townhouse units.



First 2 chapters of code book are - ANSWER Administrative



Plans or supporting documents are almost always required by the controlling authority prior
to issuing a permit. T or F - ANSWER True



Does the building official have the authority to render interpretations of the code? -
ANSWER Yes



None of the following require a permit, EXCEPT:

sidewalks and driveways

tiling

an 8 foot fence

playground equipment - ANSWER 8 foot fence.



Tables and illustrations are always supported by information found in the written code and
footnotes. T or F - ANSWER False




1

,The amount of evenly distributed weight imposed by inhabitants, goods and removable
objects on a floor or roof system is referred to as - ANSWER Live load.



If a code requirement is in the book, it is both acceptable and enforceable by the code
official. T or F - ANSWER True.



Illustrations are typically referred to as - ANSWER Figures.



Generally speaking, the building official's job is to - ANSWER Determine that buildings
are built to the minimum enforceable standard.



It is required that all manufacturer instructions be at the jobsite at the time of inspection. T
or F - ANSWER True.



All of the following are not considered habitable spaces EXCEPT:

bathrooms

kitchens

storage spaces

closets - ANSWER Kitchen.



Bathrooms must be provided with an aggregate glazing area no less than _____ square feet,
half of which must be openable. - ANSWER 3.



The maximum height of an egress window above the floor is - ANSWER 44 inches.



A basement bedroom must have an egress window with a clear opening of at least ______
square feet. - ANSWER 5.7 sq ft.




2

,At least one side-hinged exit door must be in each dwelling unit, and must be _____ feet
wide. - ANSWER 3.



A porch more than _____ inches above grade must be provided with 36" guards. -
ANSWER 30 inches.



Wall and ceiling finishes shall have a flame-spread classification of no more than ______ . -
ANSWER 200.



According to code, concrete must reach at least 70% of it's ability within ____________days.
- ANSWER 7 days.



A stud used for a non-bearing partitions may not be notched more than ____% of the stud
width. - ANSWER 40%.



The Michigan Uniform Energy code applies to new buildings as well as -
ANSWER Additions, alterations, renovation and repairs.



___________ is a measure of how well the window or door assembly conducts heat. The
lower the number, the better insulation the assembly will provide. - ANSWER U-factor.



Energy losses from recessed lighting fixtures can often reach ___% of the total thermal loss
of a ceiling. - ANSWER 50%.



Michigan requires a minimum thermal resistance of ____________for mechanical system
piping. - ANSWER R-3.



Oversized HVAC equipment has a higher initial cost, a higher operating cost, provides less
comfort, and shorter life expectancy. T or F - ANSWER True.




3

, _______ is the compliance route that applies Table 402.1.1 to building envelope
components, and is considered the most simple. - ANSWER Prescriptive Path.



___________ can be used to satisfy U-factor and SHGC requirements. - ANSWER Area
weighted averages.



Recessed lights must be _____ rated. - ANSWER IC (Insulation Contact)



Up to 15 square feet of glazing per dwelling unit is exempted from U-value requirements. T
or F - ANSWER True.



The 2009 IECC requires a permanent certificate posted on the electrical distribution panel.
The certificate shall be completed by the builder or - ANSWER Registered design
professional.



One hurdle contractors face when bidding for an energy efficient project is choosing
materials that fit the design, and also meet - ANSWER State energy code
requirements.



Historically significant buildings are not exempt from code changes. T or F -
ANSWER False.



Insulation products (blown and sprayed) must be documented with: - ANSWER R-
value

Settled thickness

Manufacturer name



The new Michigan codes took effect in - ANSWER March 2011.




4

Información del documento

Subido en
23 de enero de 2026
Número de páginas
80
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$20.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
THESTUDYVAULT
3.1
(14)
Vendido
114
Seguidores
3
Artículos
12359
Última venta
1 día hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes