SAFE SCRUM MASTER CERTIFICATION
(100% CORRECT ANSWERS) ALREADY
GRADED A+
QUESTIONS AND ANSWERS
ROAM. ANSWER - SAFe Risk Management Strategy -
Resolved, Owned, Accepted, Mitigated
ART. ANSWER - Agile Release Train
PI. ANSWER - Program Increment
IP Iteration. ANSWER - Innovation & Planning Iteration. Last Iteration in the PI. Use to
prep for PI planning, hack-a-thons, and handling tech debt.
Core SAFe Values. ANSWER - 1. Built-in Quality
2. Program Execution
3. Alignment
4. Transparency
SoS. ANSWER - Scrum of Scrums
3 Cs. ANSWER - Card, Conversation, Confirmation
CALMR. ANSWER - Culture, Automation, Lean Flow, Measurement, Recovery
INVEST. ANSWER - Independent, Negotiable, Valuable, Estimable, Small, Testable
RTE. ANSWER - Release Train Engineer
, Scrum Values. ANSWER - Courage, Commitment, Focus, Respect, Openness
3 Pillars of Scrum. ANSWER - transparency, inspection, and adaptation
PDCA. ANSWER - Plan, Do, Check, Act
NFRs. ANSWER - Non-Functional Requirements
10 SAFe Principles. ANSWER - 1. Take an economic view.
2. Apply systems thinking
3. Assume variability; preserve options
4. Build incrementally with fast, integrated learning cycles
5. Base milestones on objective evaluation of working systems
6. Visualize and limit WIP, reduce batch sizes, and manage queue lengths
7. Apply cadence, synchronize with cross-domain planning
8. Unlock the intrinsic motivation of knowledge workers
9. Decentralize decision-making
10. Organize around value
ART Events. ANSWER - 1. PI Planning
2. ART Sync
3. System Demo
4. Inspect and Adapt event
PI Planning. ANSWER - Time box = 2 days
Teams commit to a set of objectives to be delivered in the PI
ART Sync. ANSWER - Time box = 1 hour
(100% CORRECT ANSWERS) ALREADY
GRADED A+
QUESTIONS AND ANSWERS
ROAM. ANSWER - SAFe Risk Management Strategy -
Resolved, Owned, Accepted, Mitigated
ART. ANSWER - Agile Release Train
PI. ANSWER - Program Increment
IP Iteration. ANSWER - Innovation & Planning Iteration. Last Iteration in the PI. Use to
prep for PI planning, hack-a-thons, and handling tech debt.
Core SAFe Values. ANSWER - 1. Built-in Quality
2. Program Execution
3. Alignment
4. Transparency
SoS. ANSWER - Scrum of Scrums
3 Cs. ANSWER - Card, Conversation, Confirmation
CALMR. ANSWER - Culture, Automation, Lean Flow, Measurement, Recovery
INVEST. ANSWER - Independent, Negotiable, Valuable, Estimable, Small, Testable
RTE. ANSWER - Release Train Engineer
, Scrum Values. ANSWER - Courage, Commitment, Focus, Respect, Openness
3 Pillars of Scrum. ANSWER - transparency, inspection, and adaptation
PDCA. ANSWER - Plan, Do, Check, Act
NFRs. ANSWER - Non-Functional Requirements
10 SAFe Principles. ANSWER - 1. Take an economic view.
2. Apply systems thinking
3. Assume variability; preserve options
4. Build incrementally with fast, integrated learning cycles
5. Base milestones on objective evaluation of working systems
6. Visualize and limit WIP, reduce batch sizes, and manage queue lengths
7. Apply cadence, synchronize with cross-domain planning
8. Unlock the intrinsic motivation of knowledge workers
9. Decentralize decision-making
10. Organize around value
ART Events. ANSWER - 1. PI Planning
2. ART Sync
3. System Demo
4. Inspect and Adapt event
PI Planning. ANSWER - Time box = 2 days
Teams commit to a set of objectives to be delivered in the PI
ART Sync. ANSWER - Time box = 1 hour