RAC DRUGS EXAM QUESTIONS WITH
CORRECT AND VERIFIED CORRECT
ANSWERS (GRADED A+)
1. A |set |of |conditions |that |are |met |before |deliverables |are |accepted.
Acceptance |Criteria
|
2. The |act |of |formally |receiving |or |acknowledging |something |and |regarding |it |as |being |true,
sound, |suitable, |or |complete.
|
Accept
3. A |distinct, |scheduled |portion |of |work |performed |during |the |course |of |a |project.
Activity
|
4. An |alphanumeric |value |assigned |to |each |activity |that |enables |classifying, |sorting, |and |filtering.
Activity |Code
|
5. A |unique |alphanumeric |value |assigned |to |an |activity |and |used |to |differentiate |that |activity |from
other |activities.
|
Activity |Identifier
6. A |phrase |that |names |and |describes |an |activity. |See |also |activity |code |and |activity |identifier.
Activity |Label
|
7. The |realized |cost |incurred |for |the |work |performed |on |an |activity |during |a |specific |time |period.
Actual |Cost |(AC)
|
8. A |technique |for |estimating |the |duration |or |cost |of |an |activity |or |a |project |using |historical |data
from |a |similar |activity |or |project.
|
Analogous |Estimating
,9. An |activity |where |effort |is |allotted |proportionately |across |certain |discrete |efforts |and |not
divisible |into |discrete |efforts.
|
, Apportioned |Effort
10. A |factor |in |the |planning |process |considered |to |be |true, |real, |or |certain, |without |proof |or
demonstration.
|
Assumption
11. A |critical |path |method |technique |for |calculating |the |late |start |and |late |finish |dates |by |working
backward |through |the |schedule |model |from |the |project |end |date.
|
Backward |Pass
12. The |approved |version |of |a |work |product |that |can |be |changed |using |formal |change |control
procedures |and |is |used |as |the |basis |for |comparison |to |actual |results
|
Baseline
13. A |method |of |estimating |project |duration |or |cost |by |aggregating |the |estimates |of |the |lower‐
level |components |of |the |work |breakdown |structure |(WBS).
|
Bottom‐Up |Estimating
14The |sum |of |all |budgets |established |for |the |work |to |be |performed. |Budget
at |Completion |(BAC)
|
15.A |process |whereby |modifications |to |documents, |deliverables, |or |baselines |associated |with |the
|project |are |identified, |documented, |approved, |or |rejected
Change |Control
16.A |formally |chartered |group |responsible |for |reviewing, |evaluating, |approving, |delaying, |or
|rejecting |changes |to |the |project, |and |for |recording |and |communicating |such |decisions.
Change |Control |Board
CORRECT AND VERIFIED CORRECT
ANSWERS (GRADED A+)
1. A |set |of |conditions |that |are |met |before |deliverables |are |accepted.
Acceptance |Criteria
|
2. The |act |of |formally |receiving |or |acknowledging |something |and |regarding |it |as |being |true,
sound, |suitable, |or |complete.
|
Accept
3. A |distinct, |scheduled |portion |of |work |performed |during |the |course |of |a |project.
Activity
|
4. An |alphanumeric |value |assigned |to |each |activity |that |enables |classifying, |sorting, |and |filtering.
Activity |Code
|
5. A |unique |alphanumeric |value |assigned |to |an |activity |and |used |to |differentiate |that |activity |from
other |activities.
|
Activity |Identifier
6. A |phrase |that |names |and |describes |an |activity. |See |also |activity |code |and |activity |identifier.
Activity |Label
|
7. The |realized |cost |incurred |for |the |work |performed |on |an |activity |during |a |specific |time |period.
Actual |Cost |(AC)
|
8. A |technique |for |estimating |the |duration |or |cost |of |an |activity |or |a |project |using |historical |data
from |a |similar |activity |or |project.
|
Analogous |Estimating
,9. An |activity |where |effort |is |allotted |proportionately |across |certain |discrete |efforts |and |not
divisible |into |discrete |efforts.
|
, Apportioned |Effort
10. A |factor |in |the |planning |process |considered |to |be |true, |real, |or |certain, |without |proof |or
demonstration.
|
Assumption
11. A |critical |path |method |technique |for |calculating |the |late |start |and |late |finish |dates |by |working
backward |through |the |schedule |model |from |the |project |end |date.
|
Backward |Pass
12. The |approved |version |of |a |work |product |that |can |be |changed |using |formal |change |control
procedures |and |is |used |as |the |basis |for |comparison |to |actual |results
|
Baseline
13. A |method |of |estimating |project |duration |or |cost |by |aggregating |the |estimates |of |the |lower‐
level |components |of |the |work |breakdown |structure |(WBS).
|
Bottom‐Up |Estimating
14The |sum |of |all |budgets |established |for |the |work |to |be |performed. |Budget
at |Completion |(BAC)
|
15.A |process |whereby |modifications |to |documents, |deliverables, |or |baselines |associated |with |the
|project |are |identified, |documented, |approved, |or |rejected
Change |Control
16.A |formally |chartered |group |responsible |for |reviewing, |evaluating, |approving, |delaying, |or
|rejecting |changes |to |the |project, |and |for |recording |and |communicating |such |decisions.
Change |Control |Board